ESC14-01070
| Aging Inspection | 5/14/2015 | 5/14/2015 | 5/15/2015 4:00:36 PM | | PASS |
|
|
No activity. No evidence of recent sediment runoff after corrections and wattle were installed. Old BLD permit was voided and a new one is under review
|
ESC15-00501
| BMP Violation | 5/12/2015 | 5/14/2015 | 5/15/2015 8:40:10 AM | P | PART |
|
|
Check for new washout and staked in wattles.
Wattles were re-installed properly. Still need to provided new washout. RP stated it will be dug onsite next week and the old &dried out washout removed,
No new violations observed. WIP.
|
ESC14-00144
| General Inspection | 5/14/2015 | 5/14/2015 | 5/14/2015 2:12:28 PM | | PASS |
|
|
Development of East Valley phase 1 is complete. SFHs are in progress by Tahoe Homes with individual ESC permits issued.
East Valley SWPPP and CGP related project is now covered by City of Boise permit ESC15-00556. Site will now be inspected and monitored under the inspection activity of that permit.
No violations, fugitive dust, or trackout. Grading for new phase is cleared to start, BMPs installed. No work commenced yet.
|
ESC14-00144
| DOC - Permit Finaled | 5/14/2015 | 5/14/2015 | 5/14/2015 2:09:40 PM | P | PASS |
|
|
|
ESC15-00519
| Site Preparation | 5/14/2015 | 5/14/2015 | 5/14/2015 1:39:04 PM | P | PASS |
|
|
Clint Phone #: ###-####
Site ready for construction. DH #12 BMPs installed, permit sign posted. Approved.
|
ESC14-00360
| General Inspection | 5/14/2015 | 5/14/2015 | 5/14/2015 1:27:33 PM | | PASS |
|
|
|
ESC14-01087
| Aging Inspection | 5/14/2015 | 5/14/2015 | 5/14/2015 12:39:15 PM | | PASS |
|
|
Disturbed area for geothermal pool/tub is stabilized and in backyard. No loose dirt or sediment leaving site. BLD open for code issues. No further ESC inpsections needed.
|
ESC14-01087
| DOC - Permit Finaled | 5/14/2015 | 5/14/2015 | 5/14/2015 12:38:24 PM | P | PASS |
|
|
|
ESC14-01091
| General Inspection | 5/14/2015 | 5/14/2015 | 5/14/2015 12:21:15 PM | | PASS |
|
|
Pizza Pie Cafe TI is complete and open for business. All you can eat. ESC permit conditions met, no construction materials or loose sediment at site.
|
ESC14-01091
| DOC - Permit Finaled | 5/14/2015 | 5/14/2015 | 5/14/2015 12:20:33 PM | P | PASS |
|
|
|
ESC14-01097
| General Inspection | 5/14/2015 | 5/14/2015 | 5/14/2015 12:02:30 PM | | PASS |
|
|
WIP. Construction entrance provided. No trackout. No sediment leaving site via runoff. Approved.
|
ESC15-00534
| Site Preparation | 5/13/2015 | 5/14/2015 | 5/14/2015 11:43:59 AM | A | PASS |
|
|
Dan Phone #: ###-####
Permit posted. Dunham Commons SFHs are in good condition. BMPs include DI bags, lined washout, and trash enclosures. Approved to excavate.
|
ESC15-00001
| DOC - Permit Finaled | 5/14/2015 | 5/14/2015 | 5/14/2015 11:38:18 AM | P | PASS |
|
|
Home is complete, landscaped and stabilized. ESC permit conditions met.
|
ESC14-01104
| General Inspection | 5/14/2015 | 5/14/2015 | 5/14/2015 10:08:53 AM | | PASS |
|
|
Elevated refrigeration structure is complete and located behind factory in dirt/gravel alley way. No loose dirt or stockpiles. No runoff risk. ESC permit finaled.
|
ESC14-01104
| DOC - Permit Finaled | 5/14/2015 | 5/14/2015 | 5/14/2015 10:06:49 AM | P | PASS |
|
|
|
ESC14-01073
| General Inspection | 5/14/2015 | 5/14/2015 | 5/14/2015 9:50:53 AM | | PASS |
|
|
WIP. Needs to be landscaped and site cleaned for final. Near completion. Tahoe RP to notify upon completion of ESC conditions at Triplett townhomes.
|
ESC14-00588
| Conference | 5/14/2015 | 5/14/2015 | 5/14/2015 9:26:16 AM | A | PEND |
|
|
meeting to discuss dewatering plans; requested for 8:45
Big Bite Inc., utilities installer will be doing the work at the District for ESI, starting at the end of May (after Memorial Day). Plan is to use frac tank /sediment box to treat pumped groundwater. The water will then discharge into a trench that flows around site perimeter to the approx. 1 acre pond. This pond does not have an outlet pipe and a discharge to Boise River /Logger's Creek is not anticipated.
Requested that written plan modification be submitted to PDS and include:
1. Change RP name (Kevin Honeycutt) 2. Dewatering plan narrative (construction schedule, pump rates, treatment details, inspection frequencie, corrective action plan, etc) and site map
Conditions at site are currently in compliance. BMPs include stabilized construction entrance, perimeter controls, fuel station with secondary containment, and water truck for dust control.
No dewatering until plans are submitted and approved.
|