Inspections for the day of: Thursday, May 14, 2015.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEvan Jenkins
TitleEROSION CONTROL MANAGER
Phone #794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-01092 Aging Inspection5/14/20155/14/20155/14/2015 2:36:43 PM PASS
ESC14-01092 DOC - Permit Finaled5/14/20155/14/20155/14/2015 2:36:31 PMPPASS
Project Complete
No ESC Issues at this time
ESC14-00296 General Inspection5/14/20155/14/20155/14/2015 1:35:41 PM PASS
WIP: A HighSky Crane has been constructed to continue with vertical construction. No ESC issues at this time
ESC14-01107 Aging Inspection5/14/20155/14/20155/14/2015 9:44:42 AM PASS
WIP: no ESC issues at this time
ESC14-00328 General Inspection5/14/20155/14/20155/14/2015 9:30:25 AM PEND
Talked with Shane from the Wetland Group pertaining to the 3 large stockpiles left behind from the project (which are fully vegetated with a compost waddles around each stockpile). He stated he was sure but would call around then email me back what he finds out.
No issues at this time
ESC14-01053 Aging Inspection5/14/20155/14/20155/14/2015 9:05:40 AM PASS
SFH near completion. Perm vegetation needs to be established prior to this ESC permit being finaled.
No ESC issues at this time
ESC15-00324 Site Preparation5/13/20155/14/20155/14/2015 8:37:59 AMAPART
Steve Phone #: ###-####

Excavation already commenced prior to site prep inspection approval. Concrete washout needs to be moved away from sidewalk and sidewalks swept. Discussed with builder and he stated he will do so.
ESC14-01101 General Inspection5/14/20155/14/20155/14/2015 8:17:52 AM PASS
WIP: Concrete pads have been poured. No ESC issues