MIS19-00106
| MIS-Aging Inspection | 5/14/2020 | 5/14/2020 | 5/20/2020 12:07:05 PM | | CANC |
|
|
|
BLD19-03180
| BLD-Wall Bracing | 5/14/2020 | 5/14/2020 | 5/14/2020 3:48:57 PM | P | PASS |
|
|
fire wall Inspection requested via web by Carl //interior shear on fire wall//screws/ nails ok per plans, compliant with engineers email stating blocking is not needed at edges//still need rating for ele heater box in rated wall//
|
BLD19-03181
| BLD-Wall Bracing | 5/14/2020 | 5/14/2020 | 5/14/2020 3:48:37 PM | P | PASS |
|
|
Inspection requested via web by Carl Funk//interior shear on fire wall//screws/ nails ok per plans, compliant with engineers email stating blocking is not needed at edges//still need rating for ele heater box in rated wall//
|
BLD19-03187
| BLD-Wall Bracing | 5/14/2020 | 5/14/2020 | 5/14/2020 3:48:19 PM | P | PASS |
|
|
Inspection requested via web by Carl Funk//interior shear on fire wall//screws/ nails ok per plans, compliant with engineers email stating blocking is not needed at edges//still need rating for ele heater box in rated wall//
|
BLD19-03188
| BLD-Wall Bracing | 5/14/2020 | 5/14/2020 | 5/14/2020 3:48:00 PM | P | PASS |
|
|
Inspection requested via web by Carl Funk//interior shear on fire wall//screws/ nails ok per plans, compliant with engineers email stating blocking is not needed at edges//still need rating for ele heater box in rated wall//
|
BLD20-00698
| BLD-Framing/Rough-in | 5/14/2020 | 5/14/2020 | 5/14/2020 1:36:43 PM | P | PASS |
|
|
Please call Sid ###-#### Phone #: ###-#### Inspection requested via web by Carissa Mattison//steel stud wall used, ele ok, add brace near doorway in new wall//wall framing only//will need Mechanical permit to add ducts for office area prior to grid inspection///
|
BLD19-04385
| BLD-Final | 5/13/2020 | 5/14/2020 | 5/14/2020 11:14:49 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by John Treat//still needs blower door test//need to verify u values on windows are .31 for the R38, or R49 will be required for the .32 u value//
|
BLD20-00345
| BLD-Conference | 5/13/2020 | 5/14/2020 | 5/14/2020 10:28:08 AM | A | DONE |
|
|
Rusty *screened* Phone #: ###-####//questions on the separation wall construction, was determined we need clarification from Architect on separation wall and extent of rating//also need detail for attachment on ledger and beams for loft//
|
MIS20-00142
| BLD-Conference | 5/7/2020 | 5/14/2020 | 5/14/2020 9:22:49 AM | A | DONE |
|
|
follow up//permit is under review//
|
MIS20-00146
| BLD-Conference | 5/7/2020 | 5/14/2020 | 5/14/2020 9:03:31 AM | A | DONE |
|
|
follow up on permits
|
MIS20-00146
| DOC - Permit Finaled | 5/14/2020 | 5/14/2020 | 5/14/2020 9:03:20 AM | P | PASS |
|
|
permit was issued for re-roof//
|
MIS18-00458
| DOC - Permit Finaled | 5/14/2020 | 5/14/2020 | 5/14/2020 7:08:35 AM | A | PASS |
|
|
old permit, no follow ups//closing out//
|
BLD20-00304
| BLD-Final | 5/13/2020 | 5/14/2020 | 5/14/2020 12:00:00 AM | P | CANC |
|
|
Mike Phone #: ###-#### // cancelled waiting to final ELE
|