BLD96-02800
| INSP - Final | 5/15/1998 | 5/15/1998 | 5/15/1998 12:00:00 AM | A | PART |
|
|
rec'd resubmittal for oversize penetration assemblies, will verify in field.
|
BLD98-00406
| INSP - Framing/Rough-in | 5/15/1998 | 5/15/1998 | 5/15/1998 12:00:00 AM | P | FAIL |
|
|
need detail for 1hr at garage, beam or ceiling at added room
|
BLD98-00581
| INSP - Framing/Rough-in | 5/15/1998 | 5/15/1998 | 5/15/1998 12:00:00 AM | P | PART |
|
|
Scheduled by Hello!. Contact phone is [8597468]. ok for borup if horn installed, check at final
|
BLD98-00581
| INSP - Energy code compliance | 5/15/1998 | 5/15/1998 | 5/15/1998 12:00:00 AM | P | PASS |
|
|
ins ok
|
BLD98-00583
| INSP - Framing/Rough-in | 5/15/1998 | 5/15/1998 | 5/15/1998 12:00:00 AM | P | PART |
|
|
Scheduled by Hello!. Contact phone is [8597468]. 1hr wall ok; ok for borup if horn installed...ok to procced.
|
BLD98-00583
| INSP - Energy code compliance | 5/15/1998 | 5/15/1998 | 5/15/1998 12:00:00 AM | P | PASS |
|
|
ins. ok
|
MEC98-01582
| INSP - Final | 5/14/1998 | 5/15/1998 | 5/15/1998 12:00:00 AM | P | PART |
|
|
###-#### a/c permit not onsite, looks ok
|
MEC98-01582
| INSP - Final | 5/14/1998 | 5/15/1998 | 5/15/1998 12:00:00 AM | P | PART |
|
|
###-#### a/c permit not onsite, looks ok
|