Inspections for the day of: Monday, May 15, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-03245 BLD-Final5/9/20005/15/20005/15/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/09/2000 at 13:18:10. Contact: ###-####.need sign card next trip out. final ok. 5/16/00 10:48:02 AM
BLD00-00572 BLD-Framing/Rough-in5/12/20005/15/20005/15/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/12/2000 at 14:33:15. Contact: ###-####. interior framing ok. 5/15/00 11:26:30 AM
BLD00-01303 BLD-Footing5/12/20005/15/20005/15/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/12/2000 at 15:01:47. Contact: .
BLD00-01303 BLD-Footing5/12/20005/15/20005/15/2000 12:00:00 AMAPART
bill-- ###-#### ft
BLD98-02492 BLD-Wall cover5/12/20005/15/20005/15/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/12/2000 at 16:35:31. Contact: ###-####. c/n on site fire stopping third floor north loby ceilling. tape fasteners first floor north loby south wall. handrail third floor countinous at guardrail/handrail cou 5/15/00 11:00:14 AMntinous. 5/15/00 11:00:33 AM
BLD00-00770 BLD-Footing5/12/20005/15/20005/15/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/12/2000 at 16:40:49. Contact: ###-####.
BLD00-01223 BLD-Footing5/15/20005/15/20005/15/2000 12:00:00 AMPFAIL
###-#### loose dirt ansd tree roots. 5/15/00 4:34:35 PM
BLD00-00951 BLD-Framing/Rough-in5/15/20005/15/20005/15/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 05/15/2000 at 10:37:34. Contact: ###-####.tunnel corridor to be repaired at upper membrane south end and duct penatration at back of nort stair to be envloped to maintaine office membrane. fire stopping needed thtough out. walls ok for cover. 5/16/00 9:14:27 AM
BLD00-00356 BLD-Final5/15/20005/15/20005/15/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 05/15/2000 at 10:56:50. Contact: ###-####.need ele final 5/15/00 4:56:21 PM
BLD00-01251 BLD-Footing5/15/20005/15/20005/15/2000 12:00:00 AMPPASS
###-####
BLD99-03720 BLD-Framing/Rough-in5/12/20005/15/20005/15/2000 12:00:00 AMPPART
terry---###-#### ceiling grid----call 1st before insp===1 pod and spreader bars in library. 5/15/00 3:26:52 PM
BLD00-00255 BLD-Final5/8/20005/15/20005/15/2000 12:00:00 AMPFAIL
David Reid- ###-#### please call first