FIR01-00042
| INSP-Sprinkler Rough-in/Hydro | 5/14/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | A | PASS |
|
|
Mark ###-#### OK on FDC hydro test 5/15/2001 10:35:17 AM
|
BLD01-00703
| FIRE-Final Inspection | 5/14/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | A | FAIL |
|
|
###-#### fINAL fAIL fIRE eXT AND FRONT DOOR LANDING 5/15/2001 11:22:24 AM
|
BLD00-02588
| BLD-Final | 5/15/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 406 On 5/15/2001 10:41:01 AM Reinsp OK FOR CERTIFICATE OF CONPLETION
|
BLD00-03372
| BLD-Final | 5/15/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 406 On 5/15/2001 3:50:17 PM Reinsp OK for certificate of completion
|
FIR01-00037
| INSP-Alarm Testing | 5/15/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 406 On 5/15/2001 3:54:07 PM Reinsp Fail NFPA 72, Fax of signals, Add one horn/strobe, Ded circiut for FACP, Check sound levels in RR's and conf rooms
|
BLD00-02474
| FIRE-Final Inspection | 5/14/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | P | PART |
|
|
Ted Parrott ###-#### Final OK for temporary occupancy. Remaining items exc FACP to be completed within 2 to 3 days 5/15/2001 3:46:41 PM
|