BLD01-00479
| BLD-Aging Inspection | 5/15/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | | PASS |
|
|
This is an aging activity swimming pool--wip 5/15/2001 10:30:58 AM
|
BLD01-00359
| BLD-Aging Inspection | 5/15/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | | PASS |
|
|
This is an aging activity 5/15/2001 10:28:56 AM swimming pool--wip 5/15/2001 10:30:12 AM
|
BLD01-00960
| BLD-Framing/Rough-in | 5/14/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | A | NR |
|
|
###-#### Will reschedule 5/15/2001 8:30:32 AM
|
BLD00-02548
| BLD-Final | 5/14/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/14/2001 at 09:37:16. Contact: ###-####. C. of C. #20427 issued 5/15/2001 12:29:43 PM
|
BLD01-00432
| BLD-Framing/Rough-in | 5/14/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/14/2001 at 11:42:04. Contact: ###-####. C/N issued--do not insulate. 5/15/2001 9:30:38 AM
|
BLD01-00836
| BLD-Footing | 5/14/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | A | PART |
|
|
ft michael ###-#### wip 5/15/2001 8:38:20 AM
|
BLD01-01138
| BLD-Footing | 5/14/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | A | PART |
|
|
###-#### wip 5/15/2001 9:45:19 AM
|
BLD01-00229
| BLD-Energy code compliance | 5/14/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/14/2001 at 15:37:28. Contact: ###-####.
|
BLD01-00730
| BLD-Framing/Rough-in | 5/14/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 05/14/2001 at 22:35:19. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/15/2001 at 10:26:57.
|
BLD00-02026
| BLD-Framing/Rough-in | 5/14/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | P | PART |
|
|
###-#### Susp. ceiling--ok to drop difficult tiles and light in only except pool area--ok. 5/15/2001 3:35:21 PM
|
BLD00-01872
| BLD-Final | 5/15/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | P | FAIL |
|
|
Brian ###-#### No address posted--Did not go inside. 5/15/2001 1:05:44 PM
|
BLD01-00505
| BLD-Energy code compliance | 5/15/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | P | PART |
|
|
###-#### 5/15/2001 2:03:01 PM
|
BLD01-00505
| BLD-Framing/Rough-in | 5/15/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | P | PASS |
|
|
REINSPECTION ###-####
|
BLD01-00506
| BLD-Final | 5/15/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | P | FAIL |
|
|
GARY ###-#### C/N posted on site. 5/15/2001 2:40:57 PM
|
BLD01-00960
| BLD-Framing/Rough-in | 5/15/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | P | PART |
|
|
Shear ok, 1 hd at rear mispositioned--provide equal uplift retrofit--will verify at framing. 5/15/2001 2:18:27 PM
|
BLD01-00775
| BLD-Framing/Rough-in | 5/15/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/15/2001 at 11:16:27. Contact: ###-####. C/N issued-ok to cover except fireplace SHEAR 5/15/2001 1:27:07 PM
|
MEC01-01375
| Rough-in | 5/15/2001 | 5/15/2001 | 5/15/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 420 On 5/15/2001 1:46:18 PM
|