Inspections for the day of: Tuesday, May 15, 2001.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00479 BLD-Aging Inspection5/15/20015/15/20015/15/2001 12:00:00 AM PASS
This is an aging activity swimming pool--wip 5/15/2001 10:30:58 AM
BLD01-00359 BLD-Aging Inspection5/15/20015/15/20015/15/2001 12:00:00 AM PASS
This is an aging activity 5/15/2001 10:28:56 AM swimming pool--wip 5/15/2001 10:30:12 AM
BLD01-00960 BLD-Framing/Rough-in5/14/20015/15/20015/15/2001 12:00:00 AMANR
###-#### Will reschedule 5/15/2001 8:30:32 AM
BLD00-02548 BLD-Final5/14/20015/15/20015/15/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/14/2001 at 09:37:16. Contact: ###-####. C. of C. #20427 issued 5/15/2001 12:29:43 PM
BLD01-00432 BLD-Framing/Rough-in5/14/20015/15/20015/15/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 05/14/2001 at 11:42:04. Contact: ###-####. C/N issued--do not insulate. 5/15/2001 9:30:38 AM
BLD01-00836 BLD-Footing5/14/20015/15/20015/15/2001 12:00:00 AMAPART
ft michael ###-#### wip 5/15/2001 8:38:20 AM
BLD01-01138 BLD-Footing5/14/20015/15/20015/15/2001 12:00:00 AMAPART
###-#### wip 5/15/2001 9:45:19 AM
BLD01-00229 BLD-Energy code compliance5/14/20015/15/20015/15/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/14/2001 at 15:37:28. Contact: ###-####.
BLD01-00730 BLD-Framing/Rough-in5/14/20015/15/20015/15/2001 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 05/14/2001 at 22:35:19. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/15/2001 at 10:26:57.
BLD00-02026 BLD-Framing/Rough-in5/14/20015/15/20015/15/2001 12:00:00 AMPPART
###-#### Susp. ceiling--ok to drop difficult tiles and light in only except pool area--ok. 5/15/2001 3:35:21 PM
BLD00-01872 BLD-Final5/15/20015/15/20015/15/2001 12:00:00 AMPFAIL
Brian ###-#### No address posted--Did not go inside. 5/15/2001 1:05:44 PM
BLD01-00505 BLD-Energy code compliance5/15/20015/15/20015/15/2001 12:00:00 AMPPART
###-#### 5/15/2001 2:03:01 PM
BLD01-00505 BLD-Framing/Rough-in5/15/20015/15/20015/15/2001 12:00:00 AMPPASS
REINSPECTION ###-####
BLD01-00506 BLD-Final5/15/20015/15/20015/15/2001 12:00:00 AMPFAIL
GARY ###-#### C/N posted on site. 5/15/2001 2:40:57 PM
BLD01-00960 BLD-Framing/Rough-in5/15/20015/15/20015/15/2001 12:00:00 AMPPART
Shear ok, 1 hd at rear mispositioned--provide equal uplift retrofit--will verify at framing. 5/15/2001 2:18:27 PM
BLD01-00775 BLD-Framing/Rough-in5/15/20015/15/20015/15/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 05/15/2001 at 11:16:27. Contact: ###-####. C/N issued-ok to cover except fireplace SHEAR 5/15/2001 1:27:07 PM
MEC01-01375 Rough-in5/15/20015/15/20015/15/2001 12:00:00 AMPPASS
Scheduled by Inspector: 420 On 5/15/2001 1:46:18 PM