PLM02-01391
| Plumbing Rough-in | 5/14/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | A | PASS |
|
|
mike ###-#### partial r/i ok in wall only 5/15/2002 9:34:02 AM
|
PLM02-01395
| Sprinkler (Final) | 5/14/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | A | PASS |
|
|
###-#### JUDITH final ok with test ports plugged 5/15/2002 9:13:12 AM
|
PLM01-02856
| Final | 5/15/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/15/2002 at 07:01:34. Contact: ###-####. final ok 5/15/2002 10:25:32 AM
|
PLM02-01390
| Sprinkler (Final) | 5/15/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | P | FAIL |
|
|
backflow ###-#### rick existing tie in needs to be replaced 5/15/2002 2:28:35 PM
|
PLM02-01280
| Final | 5/15/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | P | PASS |
|
|
IRRIGATION SYSTEM CHRIS ###-#### OR ###-####
|
PLM02-00578
| Final | 5/15/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/15/2002 at 09:05:14. Contact: ###-####.-----for access on front door lock box code is -- sub
|
PLM02-00340
| Plumbing Rough-in | 5/15/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/15/2002 at 09:10:15. Contact: ###-####. restroom south central waste test failed , potable water from main shutoff to potable r.p. and two non-potable water r.ps. test ok 5/15/2002 4:03:36 PM
|
PLM02-00340
| Water and/or Sewer | 5/15/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/15/2002 at 09:10:56. Contact: ###-####. this was for an inside inspection 5/15/2002 4:02:12 PM
|
PLM02-00340
| Storm Drains | 5/15/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/15/2002 at 09:11:38. Contact: ###-####. test on r.d. and o.f. failed n.e. tower 5/15/2002 4:04:18 PM
|
PLM02-00905
| Final | 5/15/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | P | NR |
|
|
fn ryan- ###-#### lock box #10956-by front door
|