BLD02-00526
| BLD-Framing/Rough-in | 5/14/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/14/2002 at 07:59:05. Contact: ###-####. C/N--Ok to insulate. 5/15/2002 11:38:33 AM
|
BLD02-00744
| BLD-Framing/Rough-in | 5/14/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/14/2002 at 13:46:00. Contact: ###-####. Shear-ok to side. 5/15/2002 10:29:15 AM
|
MEC02-01256
| Rough-in | 5/14/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/14/2002 at 15:57:44. Contact: ###-####.
|
BLD01-03282
| BLD-Final | 5/14/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/14/2002 at 16:03:47. Contact: ###-####. C. of C. #22399 issued. 5/15/2002 10:28:53 AM
|
BLD02-00358
| BLD-Wall cover | 5/15/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/15/2002 at 07:45:51. Contact: . C/N posted--Completed bracing of gables per engineering. Re-inspection fee of $42.00. 5/15/2002 1:39:18 PM
|
BLD02-00359
| BLD-Framing/Rough-in | 5/15/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | P | DONE |
|
|
fr insp chris- ###-####
|
BLD02-00359
| BLD-Energy code compliance | 5/15/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | P | FAIL |
|
|
chris- ###-#### energy C/N posted--Completed insulation and call for re-inspection. 5/15/2002 2:25:59 PM
|
BLD01-01945
| BLD-Foundation | 5/15/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | P | DONE |
|
|
allen ###-#### found Special Inspection 5/15/2002 4:12:11 PM
|
BLD02-00723
| BLD-Framing/Rough-in | 5/15/2002 | 5/15/2002 | 5/15/2002 12:00:00 AM | P | PART |
|
|
shear nail- jeremy ###-#### SHEAR-Ok to side. 5/15/2002 4:11:53 PM
|