BLD99-03154
| BLD-Aging Inspection | 5/12/2003 | 5/15/2003 | 5/16/2003 12:00:00 AM | | DONE |
|
|
left notice w/ Bill Molina of Discovert Ctr...will arrange for insps... 5/16/2003 4:05:35 PM
|
BLD02-00476
| BLD-Conference | 5/15/2003 | 5/15/2003 | 5/16/2003 12:00:00 AM | A | PASS |
|
|
w/ Bill Molina...work not done, expire. 5/16/2003 10:59:58 AM
|
BLD02-01532
| BLD-Framing/Rough-in | 5/14/2003 | 5/15/2003 | 5/15/2003 12:00:00 AM | A | PART |
|
|
west portion 2nd fl walls, look ok pending trades insps. 5/15/2003 1:24:23 PM
|
BLD02-02687
| BLD-Conference | 5/14/2003 | 5/15/2003 | 5/15/2003 12:00:00 AM | A | PASS |
|
|
kim-- ###-#### ...w/ arch onsite, submit details for approved 1 or 2 hr suspended clg & shaft wall assy along corridor at 2nd fl...1 layer lid ok per GA or ICBO T-&-C, item 6-4.1. 5/15/2003 11:50:31 AM
|
BLD02-00370
| BLD-Framing/Rough-in | 5/14/2003 | 5/15/2003 | 5/15/2003 12:00:00 AM | A | PART |
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...shaft wall, need shear panel installed 1st at ext walls...thru level 4. 5/16/2003 1:27:37 PM
|
BLD02-02663
| BLD-Final | 5/13/2003 | 5/15/2003 | 5/15/2003 12:00:00 AM | A | PASS |
|
|
richard; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD02-00199
| BLD-Footing | 5/14/2003 | 5/15/2003 | 5/15/2003 12:00:00 AM | P | PART |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore...east portion walls, MTI onsite, pending report. 5/15/2003 1:53:07 PM
|
BLD03-00435
| BLD-Framing/Rough-in | 5/14/2003 | 5/15/2003 | 5/15/2003 12:00:00 AM | P | PART |
|
|
SAM; Phone #: ###-#### Internet Inspection Request from: Darla Downs...walls ok, keep c/n. 5/15/2003 4:30:34 PM
|
BLD02-01532
| BLD-Framing/Rough-in | 5/14/2003 | 5/15/2003 | 5/15/2003 12:00:00 AM | P | PART |
|
|
2nd fl, ele ok at walls. 5/15/2003 4:35:15 PM
|