Inspections for the day of: Thursday, May 15, 2003.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-00344 BLD-Framing/Rough-in5/14/20035/15/20035/15/2003 12:00:00 AMAPART
harry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
c/n posted, ok to insulate 5/15/2003 1:27:52 PM
BLD03-00254 BLD-Energy code compliance5/14/20035/15/20035/15/2003 12:00:00 AMAPASS
frank ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD03-00334 BLD-Conference5/14/20035/15/20035/15/2003 12:00:00 AMAPART
###-#### doug please call before going out go over project w/ contractor,, mainly boiler room and laundry 5/15/2003 11:49:28 AM
MEC03-00627 Final5/14/20035/15/20035/15/2003 12:00:00 AMANR
Please call Todd ###-#### if access code is needed.; Phone #: ###-#### Internet Inspection Request from: Lena Sloan
BLD03-00269 BLD-Conference5/14/20035/15/20035/15/2003 12:00:00 AMAPART
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
upper firewalls ok to stand 5/15/2003 11:57:45 AM
BLD03-00268 BLD-Conference5/14/20035/15/20035/15/2003 12:00:00 AMAPART
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
upper firewalls ok to stand 5/15/2003 11:57:28 AM
BLD01-02720 BLD-Framing/Rough-in5/14/20035/15/20035/15/2003 12:00:00 AMAFAIL
peter; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
conf. only,, need engineering analysis on all framing issues 5/15/2003 12:46:20 PM
MEC03-01182 Rough-in5/14/20035/15/20035/15/2003 12:00:00 AMAPASS
JOHN-- ###-####
BLD03-00364 BLD-Footing5/14/20035/15/20035/15/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 5/14/2003 at 1:01:52 PM. Contact: ###-####.
soil ok per T.R. 5/15/2003 2:26:20 PM
BLD01-02337 BLD-Final5/13/20035/15/20035/15/2003 12:00:00 AMPFAIL
###-#### sean ###-####,,, met with
robert rodriduze 863=4065,,,, talked about construction, venting,, appears all would be ok,,,, need to talk w/ roofer on type and method of application. 5/15/2003 2:05:24 PM
BLD02-02864 BLD-Conference5/15/20035/15/20035/15/2003 12:00:00 AMPPASS
ashley; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
final ok w/ bond on hillside 5/15/2003 3:29:27 PM
BLD02-02595 BLD-Conference5/15/20035/15/20035/15/2003 12:00:00 AMPPASS
OK TO CONTINUE 5/15/2003 4:04:58 PM
MEC03-00627 Final5/15/20035/15/20035/15/2003 12:00:00 AMPFAIL
todd ###-####
not ready 5/15/2003 3:39:28 PM
BLD03-00538 BLD-Framing/Rough-in5/15/20035/15/20035/15/2003 12:00:00 AMPPART
MATT SHEAR NAIL; Phone #: ###-#### Internet Inspection Request from: Darla Downs
upper shear ok, need lower done or engineered,,,, except nailing on alt. shear panel ok, need to verify hds at frame. 5/15/2003 2:45:44 PM
BLD03-00344 BLD-Framing/Rough-in5/15/20035/15/20035/15/2003 12:00:00 AMPPART
c/n, ok to insulate 5/15/2003 2:27:49 PM
BLD02-02506 BLD-Conference5/15/20035/15/20035/15/2003 12:00:00 AMPPASS
see terry records
covered under other bp 5/16/2003 3:27:19 PM