Inspections for the day of: Tuesday, May 15, 2007.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00444 INSP-Final Inspection5/15/20075/15/20075/15/2007 4:31:24 PMPPASS
permit finaled
FIR07-00183 INSP-Final Inspection5/15/20075/15/20075/15/2007 4:30:10 PMPPASS
Permit finaled. Additional head has been installed.
FIR07-00430 INSP-Sprinkler Rough-in5/14/20075/15/20075/15/2007 4:28:57 PMAPART
The stub out 5' past the 90 is ok to bury.
BLD07-00916 FIRE-Final Inspection5/14/20075/15/20075/15/2007 12:06:21 PMACANC
wrong inspection type called in.
BLD07-00298 FIRE-Final Inspection5/14/20075/15/20075/15/2007 12:04:34 PMAPASS
Life safety passed
FIR07-00315 INSP-Sprinkler Rough-in5/14/20075/15/20075/15/2007 10:57:49 AMAPASS
The underground supply line is ok to cover. The mastic has not been installed yet.
FIR06-00302 INSP-Final Inspection5/11/20075/15/20075/15/2007 9:54:16 AMAFAIL
Need an updated map at the facp to final.
FIR07-00440 INSP-Final Inspection5/14/20075/15/20075/15/2007 7:50:55 AMAPASS
permit finaled