Inspections for the day of: Friday, May 15, 2009.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00838 INSP-Sprinkler Rough-in5/15/20095/15/20095/18/2009 12:42:53 PMPPART
Overhead modifications are good for ceiling cover, be aware of possible obstructions to discharge that may develop due to proximity of light fixture junction boxes and pendent heads at some locations.
FIR08-00380 INSP-Final Inspection5/15/20095/15/20095/18/2009 12:39:45 PMPNH
Scheduled by a contractor via Hello! on 5/15/2009 at 10:20:38 AM. Contact: ###-####.
FIR09-00309 INSP-Final Inspection5/15/20095/15/20095/18/2009 8:02:33 AMPNR
Doug Phone #: ###-####
BLD09-00069 FIRE-Final Inspection5/7/20095/15/20095/15/2009 2:41:43 PMAPASS
One defficient location repaired while on site, inspection passed.
BLD08-02383 FIRE-Final Inspection5/15/20095/15/20095/15/2009 2:35:25 PMPPASS
Fire life safety finaled.
FIR09-00027 INSP-Final Inspection5/14/20095/15/20095/15/2009 2:31:29 PMAPART
UG fire supply line flush completed satisfactory.
FIR09-00182 INSP-Final Inspection5/15/20095/15/20095/15/2009 1:38:10 PMPPASS
Remaining two correction notice items completed, contractor to provide signals list and offsite account information for verification as discussed to PDS fire office.
BLD08-01992 FIRE-Final Inspection5/14/20095/15/20095/15/2009 11:41:57 AMAFAIL
Project is not ready for final fire life safety due to missing fire extinguishers, incompleted fire dept. access, missing building address, etc.
FIR08-00786 INSP-Alarm Testing5/13/20095/15/20095/15/2009 11:39:02 AMAPART
Testing completed for fire alarm notificaiton, initiation, and duct smoke detection for area "A" as marked on plan set. Still need record of inspection and testing forms and original stamped plan set, need to verify dB readings do not exceed max. allowed at the locker room and mechanical room entrys, provide correct descriptors matching sprinkler riser zones, verified account is set up, noted phone line troubles are not annunciated at the FACP-only indicated at the security panel.
FIR08-00157 INSP-Final Inspection5/15/20095/15/20095/15/2009 9:21:12 AMPPASS
Fire sprinkler permit finaled.
FIR05-00332 INSP-Final Inspection5/14/20095/15/20095/15/2009 9:10:19 AMAPASS
Fire sprinkler permit okay for final status.
FIR06-00297 INSP-Final Inspection5/14/20095/15/20095/15/2009 12:00:00 AMAPASS
Adam Phone #: ###-####
FIR09-00236 INSP-Final Inspection5/15/20095/15/20095/15/2009 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 5/15/2009 at 6:44:02 AM. Contact: ###-####.
BLD08-02166 FIRE-Final Inspection5/14/20095/15/20095/15/2009 12:00:00 AMAPASS
rick Phone #: ###-####
FIR06-00167 INSP-Final Inspection5/15/20095/15/20095/15/2009 12:00:00 AMPPASS
Adam Phone #: ###-####