ESC14-00144
| General Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 4:27:16 PM | | PART |
|
|
Sewer trunk extension to East Valley is installed. Need to check for vegetation and stabilization in areas outside of roadway. East Valley is continuing to be graded & grubbed. The construction entrances are not installed to specifications in the SWPPP, but no trackout observed and there has been no hauling or off hauling. No significant fugitive dust observed leaving the area.
|
ESC13-01252
| Random Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 4:00:18 PM | P | FAIL |
|
|
House is complete, landscaped, and occupied. BLD permit finaled. However, homeowner acid washed his floor and rinsed it to the nearest storm drain.
Hunter Homes RP Austin Wagner helped switch out the affected DI bag. Written notice to homeowner to clean up the mess created and not to repeat such actions. Left my number in case there are any questions.
Will check back, and if clean the permit will be finaled.
|
ESC13-00984
| BMP Violation | 5/15/2014 | 5/15/2014 | 5/15/2014 3:32:44 PM | P | FAIL |
|
|
Tahoe Homes washout is near capacity. Cement truck company spilled some concrete or concrete washout into the alley and it is now in the DI bag.
3 corrections issued verbally to RP Clint:
1. Remove full washout. 2. Provide new washout 3. Replace damaged filter bag 4. Check filter bags on all Tahoe Homes areas for maintenance.
|
ESC13-00653
| Aging Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 3:28:39 PM | | PASS |
|
|
Finaled.
|
ESC13-00653
| DOC - Permit Finaled | 5/15/2014 | 5/15/2014 | 5/15/2014 3:28:23 PM | P | PASS |
|
|
House complete and landscaped. Not yet occupied. Streets and surrounding areas have been cleaned. ESC conditions met.
|
ESC13-00636
| Aging Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 3:12:52 PM | | PASS |
|
|
Finaled.
|
ESC13-00636
| DOC - Permit Finaled | 5/15/2014 | 5/15/2014 | 5/15/2014 3:12:32 PM | P | PASS |
|
|
All exterior construction and landscaping/stabilization complete. No further ESC inspection necessary. Area will continued to be monitor for issues due to many permits in the area. BLD permit is still open.
|
ESC13-00652
| Aging Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 3:10:47 PM | | PASS |
|
|
Permit finaled. See notes.
|
ESC13-00652
| DOC - Permit Finaled | 5/15/2014 | 5/15/2014 | 5/15/2014 3:10:31 PM | P | PASS |
|
|
Construction is complete and yard is landscaped and stabilized. No temp BMP removal required. No ESC corrections or issues - permit conditions satisfied.
|
ESC13-01226
| DOC - Permit Finaled | 5/15/2014 | 5/15/2014 | 5/15/2014 2:40:47 PM | P | PASS |
|
|
|
ESC13-01226
| Site Final | 5/15/2014 | 5/15/2014 | 5/15/2014 2:40:17 PM | P | PASS |
|
|
This permit is for the site development phase of Boise Heights including dewatering, which is now complete. Vertical construction is under way and covered under ESC13-01231. The site is currently in compliance and will be closed.
|
ESC13-01231
| Random Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 2:37:03 PM | P | PASS |
|
|
The south construction entrance was moved to La Pointe street. Entrance has large angular rock and rumble bars. No trackout or other issues observed at site. Approved.
|
ESC13-00860
| Aging Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 1:18:46 PM | | PASS |
|
|
House is complete and occupied. BLD permit finaled. Homeowner is working on landscaping. No ESC corrections required.
|
ESC13-00213
| Tracking Control | 5/15/2014 | 5/15/2014 | 5/15/2014 11:01:45 AM | P | PASS |
|
|
Concrete waste and dust that was in the culdesac has been swept clean as requested. Downstream DI's have also been maintained. No new corrections.
In Terra Nativa, a request to Idaho Power to remove a concrete washout tub with liquid waste in it has also been removed as requested earlier in the week.
|
ESC13-00475
| General Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 10:44:23 AM | | PASS |
|
|
No changes to site since previous inspection. Needs landscaping and approval that boulders on hillside are not a threat. No corrections at this time.
|
ESC13-00655
| General Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 9:17:41 AM | A | PASS |
|
|
Aberdeen Square sub development is currently in compliance. The alleyways between Colehaven and Irving are currently being paved. This should provide contractor parking for the new phases occuring on Raymond. DIs have protection, gutters have little sediment accumulation. Silt fence along Allumbaugh is in good condition; SWPPP located at corner of Colehaven & Allumbaugh.
|
ESC14-00224
| General Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 9:07:51 AM | | PASS |
|
|
4 plexes in Aberdeen Square along the west side of development on Raya.mond are in progress. No significant trackout to street. Gutter are clean and DI's have filter bags. Permits posted in alley
|
ESC14-00225
| General Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 9:06:10 AM | | PASS |
|
|
|
ESC14-00223
| General Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 9:05:43 AM | | PASS |
|
|
|
ESC14-00222
| General Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 8:38:10 AM | | PASS |
|
|
|