ESC14-00131
| General Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 9:39:51 AM | | PASS |
|
|
BMP's installed throughout site. Silf fence has been installed along the back of the site along the canal that runs by, where the new barn will be placed. No ESC issues at time of inspection
|
ESC14-00145
| General Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 9:23:27 AM | | PART |
|
|
Contractor to place contact information on construction signage
|
ESC13-00082
| General Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 8:52:20 AM | | PASS |
|
|
stabilization in back yard needs to take place. no other issues at time of inspection
|
ESC13-00764
| Aging Inspection | 5/15/2014 | 5/15/2014 | 5/15/2014 8:34:23 AM | | PART |
|
|
Trackout occuring onto bent bow. Contractors preping for Paving. Contractor will sweep roads
|
ESC14-00337
| Site Preparation | 5/13/2014 | 5/15/2014 | 5/15/2014 8:19:24 AM | A | DEFR |
|
|
Grant Phone #: ###-#### not correct address for site prep or date for inspection. Grant stated he will call the front desk to get things figured out
|