Inspections for the day of: Thursday, May 15, 2014.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEvan Jenkins
TitleEROSION CONTROL MANAGER
Phone #794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00131 General Inspection5/15/20145/15/20145/15/2014 9:39:51 AM PASS
BMP's installed throughout site. Silf fence has been installed along the back of the site along the canal that runs by, where the new barn will be placed. No ESC issues at time of inspection
ESC14-00145 General Inspection5/15/20145/15/20145/15/2014 9:23:27 AM PART
Contractor to place contact information on construction signage
ESC13-00082 General Inspection5/15/20145/15/20145/15/2014 8:52:20 AM PASS
stabilization in back yard needs to take place. no other issues at time of inspection
ESC13-00764 Aging Inspection5/15/20145/15/20145/15/2014 8:34:23 AM PART
Trackout occuring onto bent bow. Contractors preping for Paving. Contractor will sweep roads
ESC14-00337 Site Preparation5/13/20145/15/20145/15/2014 8:19:24 AMADEFR
Grant Phone #: ###-####
not correct address for site prep or date for inspection. Grant stated he will call the front desk to get things figured out