MEC14-02911
| Final | 5/15/2015 | 5/15/2015 | 5/15/2015 4:31:37 PM | P | PEND |
|
|
call chris about gas piping for this ...NO GAS PIPING DONE ON THIS JOB.
|
MEC14-03084
| Final | 5/15/2015 | 5/15/2015 | 5/15/2015 4:29:29 PM | P | PEND |
|
|
call andrea and get final value..I CALLED AND TALKED TO JEFF.. HE WILL CALL AND GET THE FINAL VALUE TAKEN CARE OF
|
MEC15-01756
| Final | 5/15/2015 | 5/15/2015 | 5/15/2015 3:50:47 PM | P | FAIL |
|
|
Paul Ackerland Phone #: ###-#### >> Inspection requested via web by Ted Dumont...need to add gas piping to permit..test the new line and we need a letter from engineer regarding structural because of adding 2 new units
|
MEC14-03687
| Final | 5/15/2015 | 5/15/2015 | 5/15/2015 2:57:47 PM | P | PASS |
|
|
josh ###-####
|
MEC14-05205
| Pressure Test | 5/15/2015 | 5/15/2015 | 5/15/2015 2:25:34 PM | P | FAIL |
|
|
call contractor ###-####..i called the contractor as a reinspect was never scheduled...
|
GCM15-00103
| GCM-Final | 5/14/2015 | 5/15/2015 | 5/15/2015 2:16:24 PM | P | PASS |
|
|
(Resident) Amy ###-#### - requested call ahead
|
MEC13-03795
| DOC - Permit Expired | 5/15/2015 | 5/15/2015 | 5/15/2015 2:09:25 PM | P | PASS |
|
|
tried calling owner several times..no return call
|
MEC15-02113
| Final | 5/15/2015 | 5/15/2015 | 5/15/2015 11:54:02 AM | P | NH |
|
|
Please be in the afternoon with a call to Maureen on way ###-####. Thanks Phone #: ###-#### >> Inspection requested via web by Allie Courter..she wants to reschedule in a couple weeks as she will be done with school
|
MEC14-02061
| Conference | 5/15/2015 | 5/15/2015 | 5/15/2015 11:30:20 AM | A | PEND |
|
|
i called molly and she will check into this permit
|
MEC15-01570
| Rough-in | 5/14/2015 | 5/15/2015 | 5/15/2015 11:27:11 AM | A | PART |
|
|
please call Ernie with questions Phone #: ###-#### >> Inspection requested via web by Nicholas Paige..ok to cover ceiling by skylights and restrooms
|
MEC15-02012
| Final | 5/11/2015 | 5/15/2015 | 5/15/2015 11:25:03 AM | A | PASS |
|
|
This is a Flue Pressure and Final Inspect. Pls meet our installer at home at 10:30 AM . Install Mgr, Allen, Ph is ###-####. Phone #: ###-#### >> Inspection requested via web by Mary LaFayette
|
MEC14-02068
| Final | 5/15/2015 | 5/15/2015 | 5/15/2015 9:42:57 AM | A | NR |
|
|
call aaron about this job..no inspections ever requested ###-####..aaron will check on this and get is scheduled
|
MEC15-02104
| Final | 5/14/2015 | 5/15/2015 | 5/14/2015 4:07:37 PM | P | CANC |
|
|
Should be ready by 1pm. Jeremy is contact Phone #: ###-#### >> Inspection requested via web by Brenda St Clair Inspection cancelled from web by: Brenda St Clair
|