Inspections for the day of: Friday, May 15, 2015.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00624 INSP-Final Inspection5/15/20155/15/20155/15/2015 3:51:43 PMPFAIL
Final passed and underground flush passed. Will be ok to final when the electric alarm bell has been relocated to the front of the house.
FIR14-00799 INSP-Sprinkler Rough-in5/14/20155/15/20155/15/2015 3:49:55 PMAPART
First floor rough-in passed. Need to address combustible concealed space at entrance. Hydro test failed. Second floor lobby area rough-in passed. Head in bottom of elevator shaft passed.
FIR15-00131 INSP-Final Inspection5/15/20155/15/20155/15/2015 10:46:45 AMPPASS
Permit finaled
BLD14-03543 FIRE-Final Inspection5/14/20155/15/20155/15/2015 10:41:33 AMAPASS
Life safety passed
BLD15-01138 FIRE-Final Inspection5/15/20155/15/20155/15/2015 10:40:36 AMPFAIL
Permit is required for hood suppression/appliance modification. Provide missing canopies for fire sprinklers. Provide teting of the smoke evac. system. Provide on 2A,10BC fire extinguisher with current inspection tag mounted in a normal path of travel. Remove the dead bolts from the front and rear doors. Provide single action hardware on the rear exit door. Provide city approved plans.
BLD15-01140 FIRE-Final Inspection5/15/20155/15/20155/15/2015 10:34:08 AMPPASS
Life safety passed
BLD15-01140 FIRE-Final Inspection5/14/20155/15/20155/15/2015 9:50:02 AMAFAIL
All items corrected except the smoke evac system is non-functional
FIR14-00759 INSP-Sprinkler Rough-in/Hydro5/14/20155/15/20155/15/2015 7:39:45 AMAPASS
Rough-in passed. Piping can not be covered until a tenting inspection has passed.
BLD15-01138 FIRE-Final Inspection5/14/20155/15/20155/15/2015 12:00:00 AMACANC
Ingrid Phone #: ###-####