Inspections for the day of: Friday, May 15, 2015.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-01030 General Inspection5/15/20155/15/20155/15/2015 3:28:45 PM PASS
No activity at time of inspection. Warehouse walls have been erected. BMPs include construction entrance, permit signage, and silt fence along south boundary above canal. No corrections needed. Clean site.
ESC15-00033 General Inspection5/15/20155/15/20155/15/2015 3:06:13 PMPPASS
WIP. Some trackout due to significant rain. No muddy discharges off site. Existing sidewalk and curbing has been preserved to act as sediment containment.

Once conditions dry, the northeast entrance should be swept/cleaned.
ESC14-00300 General Inspection5/15/20155/15/20155/15/2015 3:00:35 PM PASS
Collission Center building is complete as well are the associated site improvements. No loose sediment or disturbed area at site. All construction materials have been removed. The LH Miller Honda is in progress across the street. DI bag can stay in on Auto Dr.
ESC14-00300 DOC - Permit Finaled5/15/20155/15/20155/15/2015 2:58:42 PMPPASS
ESC15-00495 Complaint Inspection5/15/20155/15/20155/15/2015 1:20:14 PMPCANC
unrelated activity within apartment complex. No construction on this permit since it has not yet been issued.
ESC15-00460 Site Preparation5/15/20155/15/20155/15/2015 12:51:41 PMPPASS
Phone #: 9144370 >> Inspection requested via mobile web by Bryan Millar

Permit sign posted. Lot prepped for excavation. Dropzone sub BMPs are installed. Streets and gutters freee of loose sediment or trackout.
ESC15-00065 Conference5/15/20155/15/20155/15/2015 12:08:01 PMPPASS
Permit sign posted. No activity occuring during the rain. No muddy runoff from site. Preservation of perimeter vegetation has around area of disturance have kept sediment on site. NO trackout, trash is contained. Approved.
ESC14-00885 General Inspection5/15/20155/15/20155/15/2015 11:41:23 AM PASS
Vegetation on the shoulders of path has established and path has been open to public for some time. Some temp wattles are still installed drainage and culvert structures. Permit should be ready to close next inspection and assess whether BMPs may remain or be removed.

Checked discharge from Council Springs Creek into the Boise River by the Eckart bridge (creek channel passess through construction site) during rain event and it clear and not turbid.
ESC14-00794 Aging Inspection5/15/20155/15/20155/15/2015 11:30:04 AM PASS
Construction complete. Yard has been seeding with grass and prepped for landscaping. Dirt contained on site by curbing. ESC permit finalled.
ESC14-00794 DOC - Permit Finaled5/15/20155/15/20155/15/2015 11:27:12 AMPPASS
ESC14-01046 Aging Inspection5/15/20155/15/20155/15/2015 11:19:32 AM PASS
WIP on East Valley Home. Near completion. Clean site, no trackout or sediment leaving site with runoff. Trash contained.
ESC14-01054 Aging Inspection5/15/20155/15/20155/15/2015 11:15:20 AM PASS
WIP. Permit sign posted. Contractors working on interior. Needs landscaping/stabilization.

Trash container is being used, materials stored on parcel with no runoff leaving area. Approved.
ESC14-01033 Aging Inspection5/15/20155/15/20155/15/2015 10:31:57 AM PASS
Home is complete. Landscaping and tree installation in progress. No more grading needed. No trackout or sediment runoff during rain event. Will close when stabilzed.
ESC14-00868 General Inspection5/15/20155/15/20155/15/2015 9:32:52 AM PASS
ESC14-00970 Aging Inspection5/15/20155/15/20155/15/2015 9:09:55 AM PASS
Home complete, landscaped, and loose sediment and materials have been cleaned up. ESC permit conditions satisfied.
ESC14-00970 DOC - Permit Finaled5/15/20155/15/20155/15/2015 9:09:06 AMPPASS