Inspections for the day of: Tuesday, May 15, 2018.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrandon Shaw
TitleBLD-COM/RES INSPECTOR
Phone #208-954-9358
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-01623 BLD-Framing/Rough-in5/14/20185/15/20185/16/2018 11:27:35 AMPPASS
PLM and MECH rough ins to be inspected after cabinets installed.
BLD18-00532 BLD-Framing/Rough-in5/15/20185/15/20185/15/2018 4:58:54 PMPNR
Need MECH rough in
BLD18-00557 BLD-Wall Bracing5/14/20185/15/20185/15/2018 4:58:27 PMPPASS
Work in progress
BLD17-04679 BLD-Foundation5/15/20185/15/20185/15/2018 4:58:12 PMPPASS
Work in progress
BLD17-04678 BLD-Foundation5/15/20185/15/20185/15/2018 4:58:01 PMPPASS
Work in progress
BLD17-04658 BLD-Foundation5/15/20185/15/20185/15/2018 4:57:49 PMPPASS
Work in progress
BLD17-04230 BLD-Wall Bracing5/15/20185/15/20185/15/2018 4:57:26 PMPPASS
Work in progress
Thrid floor shear to be done at framing
BLD17-04233 BLD-Wall Bracing5/15/20185/15/20185/15/2018 4:57:15 PMPPASS
Work in progress
Thrid floor shear to be done at framing
BLD17-04234 BLD-Wall Bracing5/15/20185/15/20185/15/2018 4:57:01 PMPPASS
Work in progress
Thrid floor shear to be done at framing
BLD18-00219 BLD-Framing/Rough-in5/14/20185/15/20185/15/2018 4:56:00 PMAFAIL
See Correction notice


OK to insulate
BLD18-01504 BLD-Foundation5/14/20185/15/20185/15/2018 4:55:03 PMAPASS
Interior courtyards