ELE20-01604
| Rough-In Permanent Service | 5/11/2020 | 5/15/2020 | 5/15/2020 1:19:05 PM | P | PASS |
|
|
please call ahead Phone #: ###-#### Inspection requested via web by Kyle Dillon... p/s u/g relocation ok
|
ELE20-01681
| Final | 5/15/2020 | 5/15/2020 | 5/15/2020 12:37:38 PM | P | CANC |
|
|
Install is complete to the disconnect. Tub is being delivered this morning and I will be onsite at 11 to complete wiring. Should be complete by 1-2pm Phone #: ###-#### Inspection requested via web by Sean Patton... service change required before final can be given...50A circuit overload existing 100A service panel
|
ELE20-01681
| Electrical Rough-In | 5/15/2020 | 5/15/2020 | 5/15/2020 12:36:37 PM | P | PASS |
|
|
Install is complete to the disconnect. Tub is being delivered this morning and I will be onsite at 11 to complete wiring. Should be complete by 1-2pm Phone #: ###-#### Inspection requested via web by Sean Patton...
wiring from panel thru attic to disconnect other side of house...romex to thhn in emt...50A GFCI breaker in disconnect requiring a service change before permit can be finaled....hot tub circuit will overload 100A service
|
ELE20-00982
| Final | 5/14/2020 | 5/15/2020 | 5/15/2020 11:28:13 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rodney Monroe...ok to final
|
ELE20-01625
| Final | 5/14/2020 | 5/15/2020 | 5/15/2020 9:48:35 AM | A | PASS |
|
|
They will be home. Robyn ; Frank - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks...disconnect moved so not behind A/C...ok to final
|
ELE20-01664
| Temporary Service | 5/14/2020 | 5/15/2020 | 5/15/2020 8:20:40 AM | A | PASS |
|
|
Please call the electrician Matt ###-#### one hour before arriving at the job site to meet him there. Thanks. Phone #: ###-#### Inspection requested via web by Nicholas Buck... t/s u/g new ok
|