Inspections for the day of: Wednesday, May 16, 2001.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03487 BLD-Aging Inspection5/16/20015/16/20015/16/2001 12:00:00 AM FAIL
This is an aging activity; no action by contractor....need final for laundry rm add'n 5/16/2001 1:40:59 PM
BLD00-03524 BLD-Aging Inspection5/16/20015/16/20015/16/2001 12:00:00 AM PART
This is an aging activity...called contractor Steve Miller/( for Larry Hanson)...had elec problem, will take card in, shows as ok for all. 5/16/2001 2:03:30 PM
BLD01-00275 BLD-Aging Inspection5/16/20015/16/20015/16/2001 12:00:00 AM PASS
This is an aging activity
BLD01-00238 BLD-Aging Inspection5/16/20015/16/20015/16/2001 12:00:00 AM PASS
This is an aging activity,demo bond release?? 5/16/2001 2:10:13 PM
BLD01-00034 BLD-Aging Inspection5/16/20015/16/20015/16/2001 12:00:00 AM FAIL
This is an aging activity...plbg shows final,no "letter" of certification for med gas rec'd...suite with this modified permit was insp'd and ok'd 5/16/2001 2:18:57 PM
BLD01-00081 BLD-Aging Inspection5/16/20015/16/20015/16/2001 12:00:00 AM PASS
This is an aging activity...garage removed, new structure in place 5/16/2001 2:13:21 PM
BLD01-00009 BLD-Aging Inspection5/16/20015/16/20015/16/2001 12:00:00 AM FAIL
This is an aging activity...spa at motel, no further action by contractor 5/16/2001 2:11:54 PM
BLD00-02572 BLD-Aging Inspection5/16/20015/16/20015/16/2001 12:00:00 AM FAIL
This is an aging activity...wip on structure at 5/16/2001 2:21:23 PM site 5/16/2001 2:21:28 PM
BLD00-03697 BLD-Final5/15/20015/16/20015/16/2001 12:00:00 AMAPASS
###-####, ok to sign at office, arch's letter ok for hvac sign off (not req'd)5/16/2001 1:43:50 PM 5/16/2001 1:44:58 PM 5/16/2001 1:46:46 PM
BLD01-00296 BLD-Final5/15/20015/16/20015/16/2001 12:00:00 AMAPASS
###-#### ok to sign at office for c/o...card not onsite, rec'd arch's letter ok for no hvac sign off. 5/16/2001 1:46:11 PM
BLD01-00207 BLD-Framing/Rough-in5/16/20015/16/20015/16/2001 12:00:00 AMPFAIL
Dean Dallas ###-####, nr, need elec. 5/16/2001 2:08:01 PM
BLD01-00428 BLD-Final5/16/20015/16/20015/16/2001 12:00:00 AMPFAIL
4th floor Tim ###-####
BLD01-00428 BLD-Final5/16/20015/16/20015/16/2001 12:00:00 AMPFAIL
4th floor Tim ###-####
BLD01-00256 BLD-Framing/Rough-in5/16/20015/16/20015/16/2001 12:00:00 AMPFAIL
fr insp tim --###-#### patch 1hr lid, wrap beam, firestop penetrations; ok to begin walls, recall before install of gyp lids 5/16/2001 5:15:15 PM
BLD00-03519 BLD-Conference5/16/20015/16/20015/16/2001 12:00:00 AMPFAIL
Added by Inspector: 340 On 5/16/2001 4:58:05 PM need eng's ok for pipes in p.t. slab & column cap, verify steel laps as req'd for compression?
BLD00-00081 BLD-Conference5/16/20015/16/20015/16/2001 12:00:00 AMPPART
Added by Inspector: 340 On 5/16/2001 4:59:01 PM w/ proj mgr, need engs ok for shearwalls changed
BLD00-00081 BLD-Conference5/16/20015/16/20015/16/2001 12:00:00 AMPPART
Added by Inspector: 340 On 5/16/2001 4:59:01 PM w/ proj mgr, need engs ok for shearwalls changed
BLD00-03519 BLD-Conference5/16/20015/16/20015/16/2001 12:00:00 AMPFAIL
Added by Inspector: 340 On 5/16/2001 4:58:05 PM need eng's ok for pipes in p.t. slab & column cap, verify steel laps as req'd for compression?
BLD99-03383 BLD-Framing/Rough-in5/16/20015/16/20015/16/2001 12:00:00 AMPFAIL
Added by Inspector: 340 On 5/16/2001 5:12:55 PM keep c/n re shafts, 4hr & 2hr occ separations.