BLD01-00873
| BLD-Foundation | 5/15/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | A | PASS |
|
|
wall brent ###-####
|
BLD01-01778
| BLD-Footing | 5/15/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | A | PASS |
|
|
ft insp- jed- ###-#### Retaining wall. 5/16/2002 12:26:05 PM
|
BLD01-02601
| BLD-Framing/Rough-in | 5/15/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/15/2002 at 16:33:05. Contact: ###-####.
|
BLD02-00752
| BLD-Conference | 5/16/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 407 On 5/16/2002 10:31:53 AM Talked with rack contractor about inspections. 5/16/2002 12:27:27 PM
|
BLD02-00995
| BLD-Framing/Rough-in | 5/15/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/15/2002 at 16:34:07. Contact: ###-####.C/N posted . Noted the roof over hand is approx 6 in from the property line , I told him to verify with pvand z should only be about 1.5 foot from line. 5/16/2002 4:57:46 PM
|
BLD02-00973
| BLD-Footing | 5/15/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/15/2002 at 19:11:34. Contact: ###-####.
|
BLD02-00945
| BLD-Foundation | 5/16/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | P | PART |
|
|
found wes- ###-####
|