FIR02-00136
| INSP-Supply line flush | 5/15/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/15/2002 at 10:49:01. Contact: ###-####. underground flush okay 5/16/2002 10:04:47 AM
|
BLD01-02848
| FIRE-Conference | 5/15/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by Inspector: 409 On 5/15/2002 12:41:19 PM
|
BLD02-00892
| FIRE-Conference | 5/16/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 409 On 5/16/2002 8:20:29 AM met with GC and all inspectors to go over requirements for occupancy; left correction notice with all requirements 5/16/2002 10:04:28 AM
|
FIR02-00098
| INSP-Supply line flush | 5/16/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/16/2002 at 09:07:30. Contact: ###-####. underground hydro okay for FDC and supply main 5/16/2002 2:01:09 PM
|