BLD02-00492
| BLD-Final | 5/15/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | A | PASS |
|
|
bill ###-####
|
BLD01-03052
| BLD-Framing/Rough-in | 5/15/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/15/2002 at 12:49:55. Contact: .
|
BLD02-00473
| BLD-Framing/Rough-in | 5/15/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/15/2002 at 12:50:57. Contact: .
|
BLD01-01860
| BLD-Framing/Rough-in | 5/15/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | A | FAIL |
|
|
mike ###-####
c/n posted 5/16/2002 12:24:16 PM
|
BLD02-00940
| BLD-Framing/Rough-in | 5/15/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | A | NH |
|
|
ZACK ###-####
|
BLD01-02888
| BLD-Framing/Rough-in | 5/15/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | A | FAIL |
|
|
justin ###-#### fr
c/n posted, ok to insulate after trades sign off 5/16/2002 11:03:41 AM
|
BLD02-00231
| BLD-Framing/Rough-in | 5/15/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | A | PASS |
|
|
###-#### justin
insulation ok also 5/16/2002 9:23:46 AM
|
MEC02-01295
| Rough-in | 5/16/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | A | NH |
|
|
|
MEC02-01190
| Pressure Test | 5/16/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | A | PASS |
|
|
|
BLD02-00585
| BLD-Conference | 5/16/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/16/2002 at 10:55:37. Contact: ###-####.
conf. on winder stairs, need to have same tread 12" out measured w/in 22 deg? arc and have min 6" tread at finished stair 5/16/2002 3:03:48 PM
|
BLD02-00611
| BLD-Conference | 5/16/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | P | PART |
|
|
###-####- kecia for conf-call 1st before insp
height concerns, t/w eddie danials arch. and contractor, said he is going to get me a set of plans to go over w/ p/z, said he has talked w/ p/z and is ok w/ average roof height per p/z,,, NEED TO KEEP CLOSE CONTACT W/ ALL PARTIES INVOLVED including neighbors on both sides 5/17/2002 8:59:06 AM
|
BLD02-00120
| BLD-Framing/Rough-in | 5/16/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | P | PASS |
|
|
fr insp larry- ###-####
deck frame 5/17/2002 8:50:31 AM
|
BLD02-00120
| BLD-Framing/Rough-in | 5/16/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | P | PASS |
|
|
fr insp larry- ###-####
ramp framing 5/16/2002 2:59:51 PM
|
MEC02-01327
| Rough-in | 5/16/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | P | PASS |
|
|
FRANK ###-####
|
BLD01-01691
| BLD-Conference | 5/16/2002 | 5/16/2002 | 5/16/2002 12:00:00 AM | P | PART |
|
|
eric ###-#### call 1st
walk through on final, ///trades, handrail, plans, firecaulk, trades, hillside, etc. 5/16/2002 1:32:54 PM
|