Inspections for the day of: Monday, May 16, 2005.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE05-00293 Final5/16/20055/16/20055/17/2005 7:33:34 AMPFAIL
cody; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles gfci in bath and laundry, label panel directory, install closet fixture or remove wiring
ELE04-01907 Conference5/16/20055/16/20055/17/2005 7:31:19 AMPDONE
mark; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ? on p/s
ELE05-01676 Electrical Rough-In5/12/20055/16/20055/17/2005 7:29:25 AMPPART
jim-- ###-####
-call 1st before insp ok
ELE05-01081 Final5/16/20055/16/20055/17/2005 7:28:27 AMPPASS
Final for upstairs bathroom. Added 1 GFCI receptacle, 2 switches, a light and a fan. Please call heath @ ###-#### for access.; Phone #: ###-#### Internet Inspection Request from: Joe Thomas
ELE04-03250 Electrical Rough-In5/16/20055/16/20055/17/2005 7:27:46 AMPPART
Scheduled by a contractor via Hello! on 5/16/2005 at 10:43:39 AM. Contact: ###-####.r/i u/g
ELE05-01696 Final5/13/20055/16/20055/16/2005 11:46:29 AMAPASS
no cardWe: 1)extended an existing circuit to a new garage door opener receptacle. 2)extended from the existing garage light to a new light over the washer.Thanks!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
ELE05-00757 Final5/14/20055/16/20055/16/2005 11:45:44 AMAPASS
no card
Scheduled by a contractor via Hello! on 5/14/2005 at 7:34:23 AM. Contact: ###-####.
ELE05-01079 Final5/16/20055/16/20055/16/2005 11:45:12 AMAPASS
no card
Internet Inspection Request from: Bob Glenn
ELE05-01704 Electrical Rough-In5/13/20055/16/20055/16/2005 11:44:20 AMAPASS
dan; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa