ELE05-01131
| Final | 5/16/2005 | 5/16/2005 | 5/16/2005 4:38:48 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/16/2005 at 9:27:38 AM. Contact: ###-####. ok final
|
ELE05-01695
| Final | 5/13/2005 | 5/16/2005 | 5/16/2005 4:37:53 PM | P | PASS |
|
|
We ran a new 20 amp 230 volt circuit to the pump vault to a new disconnect switch and wired the pressure switch and pump into it.Owner will give you the tour.Thanks!!!!! Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok fina
|
ELE05-01716
| Electrical Rough-In | 5/16/2005 | 5/16/2005 | 5/16/2005 3:28:49 PM | P | PASS |
|
|
alan ###-#### ok cover ri
|
ELE05-01400
| Final | 5/16/2005 | 5/16/2005 | 5/16/2005 3:00:37 PM | P | NH |
|
|
READY FOR FINAL INSPECTION, THANK YOU; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH maint. man to show us the work is not available today
|
ELE05-01712
| Electrical Rough-In | 5/16/2005 | 5/16/2005 | 5/16/2005 2:59:30 PM | P | NH |
|
|
THIS PERMIT IS READY FOR INSPECTION, JOB IS COMPLETE FOR FINAL ALSO, THANK YOU.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH maint. man to show us the work is not available today
|
ELE04-00583
| Final | 5/13/2005 | 5/16/2005 | 5/16/2005 11:56:04 AM | A | PASS |
|
|
Mike, These were on 2 tools in bldg 10A. SUP 05. Internet Inspection Request from: Ken Heller ok final
|
ELE05-01687
| Temporary Service | 5/13/2005 | 5/16/2005 | 5/16/2005 8:43:40 AM | A | PASS |
|
|
Internet Inspection Request from: Bob Glenn t/s u/g n ok
|
ELE05-01685
| Temporary Service | 5/13/2005 | 5/16/2005 | 5/16/2005 8:43:05 AM | A | PASS |
|
|
Internet Inspection Request from: Bob Glenn t/s u/g n ok
|
ELE05-00365
| Final | 5/13/2005 | 5/16/2005 | 5/16/2005 8:42:05 AM | A | PASS |
|
|
This is my 90 day blanket permit for Fab 4 clean room tools.; Phone #: ###-#### Internet Inspection Request from: Eric Landberg ok final
|
ELE05-01716
| Permanent Service | 5/16/2005 | 5/16/2005 | 5/16/2005 12:00:00 AM | P | PASS |
|
|
alan ###-#### p/s u/g n ok
|