FIR06-00299
| INSP-Sprinkler Rough-in | 5/16/2006 | 5/16/2006 | 5/16/2006 1:58:36 PM | P | PART |
|
|
Underground sprinkler piping from the city connection up to the last two 90's, just before entering the building is ok to cover.
|
MIS06-00100
| FIR-Final | 5/16/2006 | 5/16/2006 | 5/16/2006 1:49:48 PM | P | PASS |
|
|
Life safety finaled.
|
FIR06-00165
| INSP-Sprinkler Rough-in/Hydro | 5/15/2006 | 5/16/2006 | 5/16/2006 1:49:13 PM | P | PART |
|
|
hydrotest passed. Sprinkler rough-in passed. Dprinkler heads still need to be installed and the riser finished
|
MIS06-00110
| FIR-Final | 5/16/2006 | 5/16/2006 | 5/16/2006 1:47:26 PM | P | CANC |
|
|
Duplicate inspection
|
MIS06-00110
| FIR-Final | 5/15/2006 | 5/16/2006 | 5/16/2006 9:59:32 AM | A | PART |
|
|
A temporary occupancy was given until the emergency light in the hallway is repaired or replaced. Also the exit signs in the dining/entry areas need to be replaced with units that have battery backup. Atleast one of the new units shall have an emergency light.
|