BLD05-02404
| BLD-Wall cover | 5/15/2006 | 5/16/2006 | 5/16/2006 4:02:14 PM | P | NR |
|
|
Internet Inspection Request from: paul thornton
|
BLD05-02405
| BLD-Wall cover | 5/15/2006 | 5/16/2006 | 5/16/2006 4:02:02 PM | P | NR |
|
|
Internet Inspection Request from: paul thornton
|
BLD05-02409
| BLD-Energy code compliance | 5/15/2006 | 5/16/2006 | 5/16/2006 4:01:47 PM | P | NR |
|
|
Internet Inspection Request from: paul thornton
|
BLD06-00969
| BLD-Footing | 5/15/2006 | 5/16/2006 | 5/16/2006 2:59:45 PM | P | PASS |
|
|
frances; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD06-00400
| BLD-Concrete | 5/16/2006 | 5/16/2006 | 5/16/2006 2:40:50 PM | P | PART |
|
|
VERN ; Phone #: ###-#### Internet Inspection Request from: Darla Downs. interior slab on grade. wip, still needed to install dobies for proper clearaNCE on wire mesh.
|
MIS05-00139
| MIS-Aging Inspection | 5/16/2006 | 5/16/2006 | 5/16/2006 2:11:45 PM | | PART |
|
|
wip on deck. needs to complete the vertical guards.
|
BLD05-03239
| BLD-Framing/Rough-in | 5/15/2006 | 5/16/2006 | 5/16/2006 2:05:24 PM | P | PASS |
|
|
Michael; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Needs to complete air seal package prior to insul. c/n posted. framing ok.
|
BLD06-00394
| BLD-Framing/Rough-in | 5/15/2006 | 5/16/2006 | 5/16/2006 1:49:21 PM | P | PASS |
|
|
vaughn; Phone #: ###-#### Internet Inspection Request from: . Allframing issues have been resolved. Energy code was not yet ready.
|
BLD06-00116
| BLD-Footing | 5/16/2006 | 5/16/2006 | 5/16/2006 1:30:06 PM | P | PART |
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD06-00118
| BLD-Foundation | 5/16/2006 | 5/16/2006 | 5/16/2006 1:29:49 PM | P | PART |
|
|
foundation wall insp//donny; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD06-00120
| BLD-Footing | 5/16/2006 | 5/16/2006 | 5/16/2006 1:29:35 PM | P | PART |
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD06-00771
| BLD-Framing/Rough-in | 5/16/2006 | 5/16/2006 | 5/16/2006 11:28:13 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 5/16/2006 at 6:56:22 AM. Contact: ###-####. Reveiwed engineering for headers, lateral bracing added, add studs added for single top plate.
|
BLD06-00677
| BLD-Framing/Rough-in | 5/15/2006 | 5/16/2006 | 5/16/2006 10:58:54 AM | A | PASS |
|
|
rob-late am??; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Needs to complete air seal package prior to insul. Window by patio door upstairs needs to be safety glazed. ok to insul. c/n posted.
|
BLD06-00771
| BLD-Energy code compliance | 5/16/2006 | 5/16/2006 | 5/16/2006 10:36:33 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 5/16/2006 at 6:56:22 AM. Contact: ###-####.
|
BLD04-01035
| BLD-Final | 5/15/2006 | 5/16/2006 | 5/16/2006 10:10:41 AM | A | PASS |
|
|
steve Note: anytime 9:30 am; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD04-01035
| DOC - Permit Finaled | 5/16/2006 | 5/16/2006 | 5/16/2006 10:10:31 AM | P | PASS |
|
|
driveway has been placed.
|
BLD06-00629
| BLD-Wall cover | 5/15/2006 | 5/16/2006 | 5/16/2006 10:01:25 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 5/15/2006 at 8:54:52 AM. Contact: ###-####. Ceiling grid ok.
|
BLD04-02164
| BLD-Final | 5/15/2006 | 5/16/2006 | 5/16/2006 9:43:13 AM | A | PASS |
|
|
marty ###-####. ok for perm occ. No card on site to sign.
|
BLD05-03113
| BLD-Final | 5/15/2006 | 5/16/2006 | 5/16/2006 9:21:33 AM | A | PASS |
|
|
troy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. All isues have been resolved.
|
BLD05-03113
| DOC - Permit Finaled | 5/16/2006 | 5/16/2006 | 5/16/2006 9:21:10 AM | P | PASS |
|
|
|
BLD05-02690
| BLD-Other | 5/15/2006 | 5/16/2006 | 5/16/2006 9:10:37 AM | A | PART |
|
|
andy Note:shear; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Seperation wall.
|
BLD06-00354
| BLD-Aging Inspection | 5/16/2006 | 5/16/2006 | 5/16/2006 8:35:17 AM | | NR |
|
|
Still needs elec. final.
|
BLD05-01994
| BLD-Aging Inspection | 5/16/2006 | 5/16/2006 | 5/16/2006 8:33:47 AM | | PASS |
|
|
wip, body shop is still under construction. Should be near completion by end of May.
|