FIR12-00162
| INSP-Sprinkler Rough-in | 5/16/2012 | 5/16/2012 | 5/16/2012 5:06:01 PM | P | PART |
|
|
Overhead work at the shared physician office and office #2 are okay for ceiling cover.
|
FIR11-00496
| INSP-Sprinkler Rough-in | 5/16/2012 | 5/16/2012 | 5/16/2012 5:02:19 PM | P | PART |
|
|
Remainder of the garage level dry system okayed for cover. Also completed satisfactory hydrostatic test of the 1st floor wet system.
|
BLD12-01097
| FIRE-Final Inspection | 5/16/2012 | 5/16/2012 | 5/16/2012 4:59:26 PM | P | PASS |
|
|
Fire life safety approved provided the manual thumbturn at the main entry/exit is removed and replaced with a key operated lock as discussed. To be completed prior to structural final.
|
BLD11-01171
| FIRE-Final Inspection | 5/15/2012 | 5/16/2012 | 5/16/2012 4:55:08 PM | A | PASS |
|
|
Remainder of correction notice items verified for completion. Life safety passed.
|
FIR12-00094
| INSP-Sprinkler Rough-in | 5/16/2012 | 5/16/2012 | 5/16/2012 12:34:24 PM | A | PART |
|
|
UG IBR only okayed for cover
|
BLD11-02863
| FIRE-Sprinkler Rough-in | 5/16/2012 | 5/16/2012 | 5/16/2012 12:31:28 PM | A | PART |
|
|
Rough-in inspection completed. Discussed relocation of light fixtures or pendent sprinkler heads at bedrooms 8 and 9 to avoid possible obstructions.
|
BLD12-00328
| FIRE-Final Inspection | 5/16/2012 | 5/16/2012 | 5/16/2012 12:27:14 PM | A | PASS |
|
|
Fire life safety final inspection passed.
|