FIR11-00621
| FIR-Aging Inspection | 5/16/2012 | 5/16/2012 | 5/24/2012 10:11:05 AM | | NR |
|
|
Work is in progress
|
BLD12-01177
| FIRE-Final Inspection | 5/16/2012 | 5/16/2012 | 5/17/2012 7:06:11 AM | P | FAIL |
|
|
Need to remove or repair the exit sign. Provide testing of the mall engineered smoke evac system.
|
BLD11-02834
| BLD-Conference | 5/15/2012 | 5/16/2012 | 5/16/2012 3:40:23 PM | A | DONE |
|
|
The general contractor, the owner Steven Wong and I discussed sprinkler spacing issues. I deferred him to a qualified sprinkler contractor to perform a walk through to address potential obstruction issues. We also discussed fire alarm notification device placement and hood suppression system interconnections. I also went over new exit sign/emergency light placement and door hardware requirements.
|
BLD11-01066
| FIRE-Final Inspection | 5/16/2012 | 5/16/2012 | 5/16/2012 2:41:09 PM | P | PASS |
|
|
Life safety passed.
|
BLD12-00727
| FIRE-Final Inspection | 5/15/2012 | 5/16/2012 | 5/16/2012 11:56:00 AM | A | PASS |
|
|
Life safety passed
|
BLD11-01066
| FIRE-Final Inspection | 5/15/2012 | 5/16/2012 | 5/16/2012 10:18:12 AM | A | FAIL |
|
|
Repair the one non functional emergency light, provide certification for two fire extinguishers and provide verification that the wall between the Green Room and the Stage, with doors #4 and #8 are not now required to be fire rated. I left a message with Dan in plan review requesting clarification. A re-inspection has been scheduled for this afternoon.
|
FIR10-00577
| INSP-Final Inspection | 5/11/2012 | 5/16/2012 | 5/16/2012 9:44:20 AM | A | FAIL |
|
|
I went ahead and tested the horn/strobe and the smoke detectors for the door release. The devices functioned correctly and the signals received at the central station. The smoke detectors have been centered at the doors. What is not complete are the plans. Per the original correction notice plans needed to be re-submitted or as-builts provided showing the 30cd strobe. The fire alarm vendor chose to re-submit for a plan modification. The problem is the plan modifications show a 110cd strobe where the 30cd has been installed. Also the room size is incorrect and the actual location of the work is in the south end of the building not as shown in the north end of the building. As discussed an accurate as-built package needs to be provided prior to a final sign off.
|