BLD15-02772
| BLD-Footing | 5/16/2016 | 5/16/2016 | 5/16/2016 4:07:27 PM | P | PASS |
|
|
Tom Phone #: ###-#### with si
|
BLD15-00516
| BLD-Framing/Rough-in | 5/16/2016 | 5/16/2016 | 5/16/2016 4:06:39 PM | P | PASS |
|
|
Randy// inspection for 1st floor Phone #: ###-####
|
BLD15-04346
| BLD-Wall Bracing | 5/13/2016 | 5/16/2016 | 5/16/2016 3:36:14 PM | A | PASS |
|
|
Matt Phone #: ###-####
|
GRD15-00090
| GRD-Final | 5/16/2016 | 5/16/2016 | 5/16/2016 3:31:07 PM | P | PASS |
|
|
|
BLD16-01139
| BLD-Framing/Rough-in | 5/13/2016 | 5/16/2016 | 5/16/2016 1:41:16 PM | P | PART |
|
|
Larry Phone #: ###-#### rfi as to how to proceed at south of elvator area
|
BLD16-01471
| BLD-Foundation | 5/13/2016 | 5/16/2016 | 5/16/2016 10:49:00 AM | A | PASS |
|
|
TIm Phone #: ###-####
|
MIS16-00150
| Set Bond Amount | 5/13/2016 | 5/16/2016 | 5/16/2016 10:35:05 AM | A | PASS |
|
|
Demo-bond 5000.00
|
MIS16-00150
| DOC - Permit Finaled | 5/16/2016 | 5/16/2016 | 5/16/2016 10:34:44 AM | P | PASS |
|
|
5000.00
|
BLD16-00882
| BLD-Wall Bracing | 5/13/2016 | 5/16/2016 | 5/16/2016 10:21:16 AM | A | PART |
|
|
John Phone #: ###-#### pending portal
|