Inspections for the day of: Tuesday, May 16, 2017.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorScott Arellano
TitleFIRE PLAN REVIEWER
Phone #208-608-7109
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
NAF17-00031 INSP-Final5/16/20175/16/20175/16/2017 3:50:00 PMPPASS
Paint Booth suppression system tested OK. Powder coating booth and industrial oven to be permitted and protected separately.
NAF17-00032 INSP-Final5/16/20175/16/20175/16/2017 1:43:10 PMPPART
Ok to cover. Crawl space and roof overbuild areas with sprinkler protection to be tented and have acive heat sourced from warehouse and office areas. Final inspection will occur after finish is installed in office areas.
NAF16-00084 INSP-Sprinkler Rough-in/Hydro5/15/20175/16/20175/16/2017 1:30:30 PMAPART
Rough toc cover PASS. Crawl space and overhead inspected. Overbuild sprinklers to be heated with active heating through transfer grills from warehouse and lower office combined with insulation tenting. Finish sheet rock needs to be installed prior to final inspection.