MIS17-00127
| DOC - Permit Finaled | 5/16/2018 | 5/16/2018 | 5/16/2018 10:58:16 AM | P | PASS |
|
|
stopped by and talked to the owner, they aren't going to do the project.
|
PLM17-01820
| Plumbing Rough-in | 5/16/2018 | 5/16/2018 | 5/16/2018 10:47:06 AM | A | PART |
|
|
laundry room Phone #: ###-#### Inspection requested via web by Raul Castanon r.p.'s for the clothes washers are in the mechanical room. piping just stubbed in to room at this point. left notice c.c.c is required for those washers.
|
PLM18-01226
| Plumbing Rough-in | 5/15/2018 | 5/16/2018 | 5/16/2018 10:33:19 AM | A | PART |
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 2rd floor complete
|
PLM17-04446
| Final | 5/15/2018 | 5/16/2018 | 5/16/2018 9:56:05 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by David Scaggs final ok
|
PLM18-02026
| Plumbing Rough-in | 5/15/2018 | 5/16/2018 | 5/16/2018 9:38:49 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Walter ri ok
|
PLM18-02015
| Pressure Test | 5/15/2018 | 5/16/2018 | 5/16/2018 8:51:05 AM | A | PART |
|
|
Gas pressure test for temporary gas supply line, please contact me prior to going onsite. Phone #: ###-#### Inspection requested via web by Jason Brashears partial gas ptessure test, 60# test pass, new 2" line off the 4" existing meter out back. meter plus 60' on the roof serving east end. The project is for adding insulation on the roof so all the gas piping needs to be raised and relocated and re-reglulated.
|
PLM17-04408
| Final | 5/15/2018 | 5/16/2018 | 5/16/2018 8:20:00 AM | A | PART |
|
|
Partial final Phone #: ###-#### Inspection requested via web by PATTY KIRK misc fixtures through out, just needs a walk through when everything is ready. temp occ ok.
|