ELE96-01325
| INSP - Electrical Rough-In | 5/16/1996 | 5/17/1996 | 5/17/1996 12:00:00 AM | A | PASS |
|
|
CEILING
|
ELE96-01512
| INSP - Final | 5/17/1996 | 5/17/1996 | 5/17/1996 12:00:00 AM | P | PASS |
|
|
|
ELE96-01556
| INSP - Hot Tubs/Spas | 5/20/1996 | 5/17/1996 | 5/17/1996 12:00:00 AM | P | FAIL |
|
|
bond gutter and UL label on spa
|
ELE96-00113
| INSP - Electrical Rough-In | 5/17/1996 | 5/17/1996 | 5/17/1996 12:00:00 AM | P | PASS |
|
|
PARCIAL ROUGH IN BLGD. 2 AND 3 4TH FLOOR. GUEST ROOMS ONLY
|