BLD99-00682
| FIRE-Final Inspection | 5/12/2000 | 5/17/2000 | 5/17/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/12/2000 at 12:46:15. Contact: . Final fail alarm submittal not on site corrections required. 5/17/00 2:05:24 PM
|
MIS00-00132
| FIR-Final | 5/12/2000 | 5/17/2000 | 5/17/2000 12:00:00 AM | A | FAIL |
|
|
###-#### call first for access Final fail C/N issued. 5/18/00 3:10:42 PM
|
FIR00-00130
| INSP-Sprinkler Rough-in | 5/16/2000 | 5/17/2000 | 5/17/2000 12:00:00 AM | A | PART |
|
|
###-#### Ok on sprinkler R/I for phase 2. 5/17/00 2:05:03 PM
|
BLD00-00495
| FIRE-Final Inspection | 5/16/2000 | 5/17/2000 | 5/17/2000 12:00:00 AM | A | PASS |
|
|
###-#### Reinsp. ok for perm. occ. 5/17/00 2:04:50 PM
|
BLD00-00879
| FIRE-Final Inspection | 5/17/2000 | 5/17/2000 | 5/17/2000 12:00:00 AM | P | FAIL |
|
|
###-####--dennis fire fn Final fail C/N issued. 5/18/00 3:10:50 PM
|
FIR00-00285
| INSP-Final Inspection | 5/17/2000 | 5/17/2000 | 5/17/2000 12:00:00 AM | P | PASS |
|
|
###-#### Ok on alarm system for space. 5/18/00 3:10:58 PM
|
BLD99-02057
| BLD-Final | 5/17/2000 | 5/17/2000 | 5/17/2000 12:00:00 AM | P | PASS |
|
|
Reinsp. ok for perm. occ.
|
FIR99-00441
| INSP-Final Inspection | 5/17/2000 | 5/17/2000 | 5/17/2000 12:00:00 AM | P | PASS |
|
|
Ok on sprinkler monitoring alarm system.
|