Inspections for the day of: Thursday, May 17, 2001.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00745 BLD-Framing/Rough-in5/16/20015/17/20015/17/2001 12:00:00 AMAPART
shear-- lori ###-#### Shear OK. 5/17/2001 9:57:03 AM
BLD01-01130 BLD-Foundation5/16/20015/17/20015/17/2001 12:00:00 AMAPASS
james ###-####
BLD00-02862 BLD-Framing/Rough-in5/16/20015/17/20015/17/2001 12:00:00 AMAPASS
bill-- ###-####--fr insp
BLD01-00043 BLD-Foundation5/17/20015/17/20015/17/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/17/2001 at 06:39:43. Contact: ###-####.
BLD01-00934 BLD-Framing/Rough-in5/17/20015/17/20015/17/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 05/17/2001 at 07:12:38. Contact: ###-####. NR 5/17/2001 9:57:21 AM
MIS01-00040 BLD-Conference5/17/20015/17/20015/17/2001 12:00:00 AMAPART
Added by Inspector: 316 On 5/17/2001 9:42:22 AM C/N....as directed by Bob A. Correct int and ext stairs to meet min. run of 9" and max. rise of 8" Handrails per 1003.3.3.6 97 UBC....and include return handrails back to wall.
BLD01-00556 BLD-Framing/Rough-in5/17/20015/17/20015/17/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/17/2001 at 10:22:14. Contact: ###-####. Energy Pass 5/17/2001 4:30:25 PM
BLD01-00926 BLD-Framing/Rough-in5/17/20015/17/20015/17/2001 12:00:00 AMPPASS
Chuck ###-####
BLD01-00696 BLD-Framing/Rough-in5/17/20015/17/20015/17/2001 12:00:00 AMPFAIL
steve ###-#### C/N posted 5/17/2001 4:27:52 PM