Inspections for the day of: Thursday, May 17, 2001.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01194 BLD-Framing/Rough-in5/16/20015/17/20015/17/2001 12:00:00 AMAPASS
please call first Perry ###-####
ok to cover framing w/ verbal corrections 5/17/2001 1:39:17 PM
BLD00-01683 BLD-Framing/Rough-in5/16/20015/17/20015/17/2001 12:00:00 AMAFAIL
###-####
c/n posted, trades, int. shear, address, plans etc. 5/17/2001 11:57:32 AM
MEC01-01467 Final5/16/20015/17/20015/17/2001 12:00:00 AMAPASS
###-#### Cheryl a/c only
BLD01-00450 BLD-Framing/Rough-in5/16/20015/17/20015/17/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/16/2001 at 08:05:01. Contact: ###-####.ok to insulate, c/n on insulation tag 5/17/2001 10:06:06 AM
BLD01-00451 BLD-Framing/Rough-in5/16/20015/17/20015/17/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 05/16/2001 at 08:08:48. Contact: ###-####.ok to insulate, c/n on insulation tag 5/17/2001 10:05:38 AM
BLD00-01478 BLD-Wall cover5/16/20015/17/20015/17/2001 12:00:00 AMPPASS
look at fire wall on north end, verify f/b in upper units 5/16/2001 1:27:09 PM
BLD00-03674 BLD-Footing5/17/20015/17/20015/17/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 05/17/2001 at 08:00:37. Contact: ###-####.wip on trellis ftgs 5/17/2001 2:01:24 PM
BLD01-00271 BLD-Final5/17/20015/17/20015/17/2001 12:00:00 AMPPART
janet ###-#### reinspection
looks like painting is done from outside, should be ok for c of c 5/17/2001 3:10:00 PM
MEC01-00169 Final5/17/20015/17/20015/17/2001 12:00:00 AMPFAIL
reinspection Joe ###-####
range hood still not right 5/17/2001 3:22:55 PM
BLD01-00225 BLD-Foundation5/17/20015/17/20015/17/2001 12:00:00 AMPFAIL
masonry wall Curtis ###-####
MEC01-01414 Rough-in5/17/20015/17/20015/17/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/17/2001 at 10:40:50. Contact: ###-####.
verify combustion air at final, there is a hole in side now but would need vent cover 5/17/2001 2:36:09 PM
BLD01-00222 BLD-Concrete5/17/20015/17/20015/17/2001 12:00:00 AMPCANC
Scheduled by Inspector: 415 On 5/17/2001 3:29:17 PM
BLD01-00225 BLD-Concrete5/17/20015/17/20015/17/2001 12:00:00 AMPPART
wip, ok to grout, ok to go 6ft on fuel tank wall 5/17/2001 3:54:47 PM