BLD01-00386
| BLD-Final | 5/16/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | A | NR |
|
|
###-#### Not ready for final, no carpets, door, all utilities sign offs, etc. 5/17/2001 9:48:00 AM
|
BLD01-01145
| BLD-Footing | 5/16/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | A | FAIL |
|
|
###-####\\ ok per Jim W. Setbacks not per plans 5/17/2001 12:29:45 PM
|
MEC01-01424
| Rough-in | 5/16/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/16/2001 at 15:03:46. Contact: ###-####.
|
MEC01-01424
| Pressure Test | 5/16/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/16/2001 at 15:04:13. Contact: ###-####.
|
BLD01-00730
| BLD-Framing/Rough-in | 5/16/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/16/2001 at 21:42:44. Contact: ###-####.
|
BLD01-00775
| BLD-Framing/Rough-in | 5/17/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 05/17/2001 at 07:12:08. Contact: ###-####. Shear -- ok 5/17/2001 8:52:30 AM
|
BLD01-00522
| BLD-Framing/Rough-in | 5/17/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 05/17/2001 at 07:13:27. Contact: ###-####. SHEAR-ok to cover 5/17/2001 2:54:50 PM
|
BLD01-00794
| BLD-Footing | 5/17/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | P | PASS |
|
|
Dave ###-#### pouring at 12:30
|
BLD00-03259
| BLD-Foundation | 5/17/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | P | PASS |
|
|
George ###-####slab/turn down 5/17/2001 12:31:34 PM
|
BLD00-03268
| BLD-Foundation | 5/17/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | P | PASS |
|
|
George ###-####slap/turn down 5/17/2001 12:32:48 PM
|
BLD00-03269
| BLD-Foundation | 5/17/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | P | PASS |
|
|
George ###-####slab/turn down 5/17/2001 12:32:59 PM
|
BLD00-03271
| BLD-Foundation | 5/17/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | P | PASS |
|
|
George ###-####slab/turn down 5/17/2001 12:32:34 PM
|
BLD00-03272
| BLD-Foundation | 5/17/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | P | PASS |
|
|
George ###-####slap/turn down 5/17/2001 12:33:10 PM
|
BLD00-03273
| BLD-Foundation | 5/17/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | P | PASS |
|
|
George ###-####slap/turn down 5/17/2001 12:33:29 PM
|
BLD00-03274
| BLD-Foundation | 5/17/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | P | PASS |
|
|
George ###-####slap/turn down 5/17/2001 12:33:19 PM
|
BLD00-03275
| BLD-Foundation | 5/17/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | P | PASS |
|
|
George ###-####slab/turn down 5/17/2001 12:31:48 PM
|
BLD00-03276
| BLD-Foundation | 5/17/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | P | PASS |
|
|
George ###-####slab/turn down 5/17/2001 12:32:02 PM
|
BLD00-03277
| BLD-Foundation | 5/17/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | P | PASS |
|
|
George ###-####slab/turn down 5/17/2001 12:32:24 PM
|
BLD01-00730
| BLD-Framing/Rough-in | 5/17/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/17/2001 at 10:25:13. Contact: ###-####. C/N issued--ok to insulate. 5/17/2001 1:41:26 PM
|
BLD01-01145
| BLD-Footing | 5/17/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | P | PART |
|
|
dirk ###-#### as late as possible wip--setbacks corrected from prior inspection 5/17/2001 3:13:33 PM
|
BLD00-02026
| BLD-Framing/Rough-in | 5/17/2001 | 5/17/2001 | 5/17/2001 12:00:00 AM | P | PART |
|
|
###-#### ceiling grid Fire assemblies and grid ok for cover 1, 2, 3, floor, pool ok. NOT conference, corridor 133 and mechanical area, and lobby not been inspected. 5/17/2001 2:25:03 PM
|