Inspections for the day of: Thursday, May 17, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-01461 Final5/16/20015/17/20015/17/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/16/2001 at 14:45:54. Contact: ###-####. 5/17/2001 8:56:24 AM
MEC01-01388 Final5/16/20015/17/20015/17/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/16/2001 at 14:52:24. Contact: ###-####. early as possible they have to go to work
BLD01-00181 BLD-Final5/16/20015/17/20015/17/2001 12:00:00 AMAPASS
Tony ###-####
MIS01-00092 BLD-Conference5/16/20015/17/20015/17/2001 12:00:00 AMAPASS
contact to meet there Mary Blevins ###-#### 5/17/2001 9:40:58 AM 5/17/2001 9:58:01 AM on site to check an addition to the back of a home that was built with out a permit roof is at a1in 12 has 2x6 spaning 15 ft 24 ins oc roof is sagging area isnt heated told mary and jerred that this area couldent be consitered habitable space 5/17/2001 10:55:23 AM
BLD01-00173 BLD-Framing/Rough-in5/17/20015/17/20015/17/2001 12:00:00 AMPPART
Miles ###-#### shear nailing needs to add stapel to front panels and block ok to cover the rest 5/17/2001 4:48:09 PM
BLD00-03104 BLD-Framing/Rough-in5/17/20015/17/20015/17/2001 12:00:00 AMPPASS
STeve ###-#### 5/17/2001 2:23:33 PM shear nailing and roof ok to cover 5/17/2001 3:55:27 PM
MEC01-01410 Final5/17/20015/17/20015/17/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 05/17/2001 at 08:53:42. Contact: ###-####.
BLD01-01138 BLD-Foundation5/17/20015/17/20015/17/2001 12:00:00 AMPPART
Bob ###-####