Inspections for the day of: Friday, May 17, 2002.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR02-00136 INSP-Sprinkler Rough-in/Hydro5/15/20025/17/20025/17/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 05/15/2002 at 10:49:48. Contact: ###-####. talked to Terry and the system has leak so hydro will be in pm; told them to call in the overhead permit under FIR02-00143 5/17/2002 9:32:42 AM
FIR02-00136 INSP-Sprinkler Rough-in/Hydro5/17/20025/17/20025/17/2002 12:00:00 AMPPASS
terry ###-#### hydro okay 5/17/2002 3:49:00 PM
FIR02-00143 INSP-Sprinkler Rough-in/Hydro5/17/20025/17/20025/17/2002 12:00:00 AMPPART
Scheduled by Inspector: 409 On 5/17/2002 9:05:59 AM hydro test okay; need flow switch and tamper control valve on hose station as indicated on approved plans; flow switch within 24 inches of control valve; awaiting alarm installation and testing; outside bell not installed 5/17/2002 3:51:24 PM
FIR02-00136 INSP-Final Inspection5/17/20025/17/20025/17/2002 12:00:00 AMPPASS
Added by Inspector: 409 On 5/17/2002 3:49:13 PM