BLD03-02072
| BLD-Framing/Rough-in | 5/14/2004 | 5/17/2004 | 5/17/2004 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/14/2004 at 3:16:03 PM. Contact: ###-####. c/n posted on front window. 5/17/2004 9:50:53 AM
|
BLD03-01479
| BLD-Final | 5/16/2004 | 5/17/2004 | 5/17/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 5/16/2004 at 9:12:45 PM. Contact: ###-####.
|
BLD04-00667
| BLD-Framing/Rough-in | 5/17/2004 | 5/17/2004 | 5/17/2004 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/17/2004 at 7:50:16 AM. c/n posted to front window. 5/17/2004 2:45:33 PM
|
MEC04-00062
| Final | 5/17/2004 | 5/17/2004 | 5/17/2004 12:00:00 AM | P | FAIL |
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Need double wall b-vent to furnace in attic. Expose overflow drain at soffit that has been covered up by siding contractor.5/17/2004 1:38:52 PM 5/17/2004 1:40:09 PM
|
MEC04-01279
| Final | 5/17/2004 | 5/17/2004 | 5/17/2004 12:00:00 AM | P | PASS |
|
|
###-#### Cliff
|
BLD04-00416
| BLD-Final | 5/17/2004 | 5/17/2004 | 5/17/2004 12:00:00 AM | P | PASS |
|
|
Gail; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|