FIR05-00222
| INSP-Sprinkler Rough-in | 5/17/2005 | 5/17/2005 | 5/17/2005 4:11:02 PM | P | PASS |
|
|
Underground supply piping is ok to cover
|
FIR05-00217
| INSP-Supply line flush | 5/17/2005 | 5/17/2005 | 5/17/2005 3:45:55 PM | P | PASS |
|
|
Underground supply line flush and underground hydro test passed. I had contractor measure leakage. 5 1/2 quarts was allowed and it lost approx. 2 1/2 to 3 quarts
|
MIS05-00056
| FIR-Final | 5/17/2005 | 5/17/2005 | 5/17/2005 1:48:56 PM | P | PART |
|
|
A temporary occupancy was given until sprinkler coverage is provided in the walkin cooler, the fire extinguisher is lowered and provided with a current inspection tag and the menu sign is relocated as discussed so that it will not block sprinkler coverage
|
FIR05-00217
| INSP-Sprinkler Rough-in | 5/17/2005 | 5/17/2005 | 5/17/2005 12:04:57 PM | P | FAIL |
|
|
I started rough-in inspection on the dry system at the request of the onsite sprinkler fitter but could not do the inspection due to pipe routing and sizing not matching approved plans. Upright heads are not spaced in accordance with NFPA 13 for obstruct
|
BLD04-02121
| FIRE-Conference | 5/16/2005 | 5/17/2005 | 5/17/2005 11:14:15 AM | A | DONE |
|
|
Spoke to Phil about duct smoke detector locations. The north one needs relocated to be ahead of the elbow
|
BLD04-01267
| FIRE-Final Inspection | 5/16/2005 | 5/17/2005 | 5/17/2005 9:23:47 AM | A | PART |
|
|
A temporary occupancy was given with Sam Rogers permission. Items needing correcting are adding exit discharge lighting outside of the main exit, adding emergency lighting in the main lobby and in the south conference room, and adding a exit sign at the b
|
FIR04-00768
| INSP-Final Inspection | 5/16/2005 | 5/17/2005 | 5/17/2005 9:21:05 AM | A | PASS |
|
|
Fire alarm finaled
|