FIR05-00632
| FIR-Aging Inspection | 5/17/2006 | 5/17/2006 | 5/22/2006 11:54:03 AM | | NR |
|
|
Per Ray work is still in progress.
|
FIR06-00216
| INSP-Final Inspection | 5/17/2006 | 5/17/2006 | 5/18/2006 8:43:04 AM | P | PASS |
|
|
Permit finaled
|
BLD05-00928
| FIRE-Final Inspection | 5/17/2006 | 5/17/2006 | 5/17/2006 5:52:43 PM | P | FAIL |
|
|
No approved plans on site. No inspection performed.
|
FIR05-00644
| INSP-Sprinkler Rough-in | 5/16/2006 | 5/17/2006 | 5/17/2006 3:14:55 PM | P | PASS |
|
|
The remaining attic system passed rough-in inspection. Sprinkler coverage in the east catwalk area has been added and is being resubmitted for review. This work was not inspected
|
FIR06-00146
| INSP-Sprinkler Rough-in/Hydro | 5/16/2006 | 5/17/2006 | 5/17/2006 3:09:37 PM | P | PASS |
|
|
Sprinkler piping located above the layin ceilings is ok to be covered. The two additional heads in the concealed pockets have been installed.
|
BLD05-02069
| BLD-Aging Inspection | 5/17/2006 | 5/17/2006 | 5/17/2006 3:06:32 PM | | PASS |
|
|
Fire alarm permit has been finaled. This permit ok for perm occupancy
|
BLD04-02445
| BLD-Aging Inspection | 5/17/2006 | 5/17/2006 | 5/17/2006 2:26:47 PM | | NR |
|
|
I left a correction notice with the man incharge at FED EX and showed him that the doors need sprinkler coverage below them. I also left a message for ART at Petra Construction about the same issues.
|
FIR06-00146
| INSP-Supply line flush | 5/16/2006 | 5/17/2006 | 5/17/2006 1:36:53 PM | P | PASS |
|
|
Underground hydro test passed.
|
FIR05-00536
| INSP-Sprinkler Rough-in | 5/16/2006 | 5/17/2006 | 5/17/2006 11:52:52 AM | A | PASS |
|
|
The east half of the tower basement rough-in passed. Also the standpipe passed. Some piping has not been installed yet and is marked as such on the plans. Ceiling have not been installed which means arm overs will need to be inspected prior to coverup.
|
FIR06-00359
| INSP-Final Inspection | 5/16/2006 | 5/17/2006 | 5/17/2006 11:51:11 AM | A | PASS |
|
|
permit finaled
|
FIR05-00856
| INSP-Conference | 5/17/2006 | 5/17/2006 | 5/17/2006 9:27:45 AM | P | DONE |
|
|
Correction notice left with Carolyn Mauer that all FIR permits to be finaled by 5-23-2006 or the school will be shutdown. I called Ken at AEI, Brad at SimplexGrinnell and left a message for Randy at DeBest about their permits needing finaled. I also contacted Dave Hanniman about what is going on.
|
FIR05-00446
| INSP-Conference | 5/17/2006 | 5/17/2006 | 5/17/2006 9:27:20 AM | P | DONE |
|
|
Correction notice left with Carolyn Mauer that all FIR permits to be finaled by 5-23-2006 or the school will be shutdown. I called Ken at AEI, Brad at SimplexGrinnell and left a message for Randy at DeBest about their permits needing finaled. I also contacted Dave Hanniman about what is going on.
|
FIR05-00496
| INSP-Conference | 5/17/2006 | 5/17/2006 | 5/17/2006 9:27:00 AM | P | DONE |
|
|
Correction notice left with Carolyn Mauer that all FIR permits to be finaled by 5-23-2006 or the school will be shutdown. I called Ken at AEI, Brad at SimplexGrinnell and left a message for Randy at DeBest about their permits needing finaled. I also contacted Dave Hanniman about what is going on.
|
FIR05-00495
| INSP-Conference | 5/17/2006 | 5/17/2006 | 5/17/2006 9:26:38 AM | P | DONE |
|
|
Correction notice left with Carolyn Mauer that all FIR permits to be finaled by 5-23-2006 or the school will be shutdown. I called Ken at AEI, Brad at SimplexGrinnell and left a message for Randy at DeBest about their permits needing finaled. I also contacted Dave Hanniman about what is going on.
|
FIR05-00494
| INSP-Conference | 5/17/2006 | 5/17/2006 | 5/17/2006 9:25:07 AM | P | PASS |
|
|
Correction notice left with Carolyn Mauer that all FIR permits to be finaled by 5-23-2006 or the school will be shutdown. I called Ken at AEI, Brad at SimplexGrinnell and left a message for Randy at DeBest about their permits needing finaled. I also contacted Dave Hanniman about what is going on.
|
BLD06-00699
| FIRE-Final Inspection | 5/16/2006 | 5/17/2006 | 5/17/2006 9:15:23 AM | A | PASS |
|
|
Life safety finaled
|
FIR06-00299
| INSP-Sprinkler Rough-in | 5/16/2006 | 5/17/2006 | 5/17/2006 9:15:08 AM | A | PASS |
|
|
the remaining underground piping is ok to cover
|