PLM06-03880
| Water and/or Sewer | 5/17/2007 | 5/17/2007 | 5/17/2007 4:53:17 PM | P | PASS |
|
|
|
PLM06-03880
| DOC - Permit Finaled | 5/17/2007 | 5/17/2007 | 5/17/2007 4:53:08 PM | P | PASS |
|
|
|
PLM06-04147
| Final | 5/17/2007 | 5/17/2007 | 5/17/2007 4:51:59 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 5/17/2007 at 9:03:13 AM. Contact: ###-####.
|
PLM07-01662
| Sprinkler (Final) | 5/17/2007 | 5/17/2007 | 5/17/2007 4:22:29 PM | P | PART |
|
|
Brett ; Phone #: ###-#### Internet Inspection Request from: Darla Downs Eric this is across from address of 5800 Gary lane-needs to remove tee on the upstream side of rpba, ok to cover.
|
PLM06-03063
| Plumbing Rough-in | 5/17/2007 | 5/17/2007 | 5/17/2007 3:54:15 PM | P | PASS |
|
|
d-wing rough-in complete.
|
PLM07-01322
| Sprinkler (Final) | 5/17/2007 | 5/17/2007 | 5/17/2007 3:05:36 PM | P | FAIL |
|
|
same as plm07-01323
|
PLM07-01320
| Sprinkler (Final) | 5/17/2007 | 5/17/2007 | 5/17/2007 3:04:30 PM | P | FAIL |
|
|
same as plm07-01323
|
PLM07-01321
| Sprinkler (Final) | 5/17/2007 | 5/17/2007 | 5/17/2007 3:03:35 PM | P | FAIL |
|
|
same as plm07-01323
|
PLM07-01323
| Sprinkler (Final) | 5/17/2007 | 5/17/2007 | 5/17/2007 3:02:16 PM | P | FAIL |
|
|
blowout tee needs to be upstream of dbcv,need 2 hose clamps on each fitting,hose clamps need to be 180 degree's from each other.
|
PLM07-01181
| Other | 5/17/2007 | 5/17/2007 | 5/17/2007 2:37:55 PM | P | FAIL |
|
|
this was a conferance with lee, eric, cascade pipeline & general of job on storm drains, need to replace tee's with directional fittings, test system, camera or man drill storm drains.
|
PLM07-01194
| Final | 5/16/2007 | 5/17/2007 | 5/17/2007 12:03:18 PM | A | NH |
|
|
plumbing contractor was going to call for access, will have to call when can have access.
|
PLM06-03063
| Plumbing Rough-in | 5/16/2007 | 5/17/2007 | 5/17/2007 12:01:05 PM | A | PART |
|
|
missing some nail plates, isolators, supports on pex, curved pex stub outs & 1/2" copper line in w/h room.
|
PLM07-01585
| Plumbing Rough-in | 5/17/2007 | 5/17/2007 | 5/17/2007 10:45:10 AM | A | PASS |
|
|
Brandon Phone #: ###-#### Internet Inspection Request from: Brandon Rohricht
|
PLM07-01657
| Plumbing Rough-in | 5/16/2007 | 5/17/2007 | 5/17/2007 10:22:25 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles-r-i pass, need to check tie in in existing crawl space on final.
|
PLM07-01181
| Water and/or Sewer | 5/17/2007 | 5/17/2007 | 5/17/2007 10:04:28 AM | A | PART |
|
|
water line ok to cover, still needs tested.
|
PLM07-01181
| Other | 5/17/2007 | 5/17/2007 | 5/17/2007 9:11:46 AM | A | FAIL |
|
|
this was a conferance on roof drain lines in the under ground, ther was never any inspections, have to change out tees & use directional fittings, there are 8 tees that i am aware off, they will bring out pictures of work done in ground, also expose water line connection from copper to pvc.
|
PLM07-01181
| Plumbing Rough-in | 5/16/2007 | 5/17/2007 | 5/17/2007 7:41:34 AM | A | CANC |
|
|
Lloyd ; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|