BLD15-04099
| BLD-Final | 5/16/2016 | 5/17/2016 | 5/17/2016 3:19:14 PM | P | NR |
|
|
would like call ahead; Bob Phone #: ###-#### frame ok pending mech aproval
|
BLD16-00215
| BLD-Ceiling Grid Inspection | 5/17/2016 | 5/17/2016 | 5/17/2016 3:18:26 PM | P | FAIL |
|
|
John Phone #: ###-#### need hvac and ele/ run mains to wall on top of cooler
|
BLD16-00692
| BLD-Ceiling Grid Inspection | 5/16/2016 | 5/17/2016 | 5/17/2016 1:52:51 PM | P | PASS |
|
|
Mark Phone #: ###-#### pending others
|
BLD15-04452
| BLD-Foundation | 5/17/2016 | 5/17/2016 | 5/17/2016 1:33:49 PM | P | PASS |
|
|
Rebar // Dave Phone #: ###-####
|
BLD15-03753
| BLD-Wall cover | 5/16/2016 | 5/17/2016 | 5/17/2016 11:58:31 AM | A | PASS |
|
|
Not there until 9 am......Shear // Goldy Phone #: ###-####
|
BLD14-01987
| BLD-Energy code compliance | 5/16/2016 | 5/17/2016 | 5/17/2016 11:39:01 AM | A | NR |
|
|
Mike// please call before Phone #: ###-####
|
BLD14-01987
| BLD-Framing/Rough-in | 5/16/2016 | 5/17/2016 | 5/17/2016 11:38:26 AM | A | FAIL |
|
|
Mike Phone #: ###-####// please call beforeneed hvac/ stair fire blk/ header east gable/ ceilling fire blk
|
BLD16-01650
| BLD-Framing/Rough-in | 5/16/2016 | 5/17/2016 | 5/17/2016 11:06:15 AM | A | PASS |
|
|
Mans Phone #: ###-####
|
BLD16-01747
| BLD-Framing/Rough-in | 5/16/2016 | 5/17/2016 | 5/17/2016 10:31:37 AM | A | PASS |
|
|
Call Tim 30 minutes prior for access Phone #: ###-#### Inspection requested via web by Timothy Gammill
|
BLD16-00236
| BLD-Framing/Rough-in | 5/16/2016 | 5/17/2016 | 5/17/2016 10:18:36 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall c/n ok to insulate
|
BLD15-03883
| BLD-Framing/Rough-in | 5/17/2016 | 5/17/2016 | 5/17/2016 10:17:18 AM | A | PASS |
|
|
2nd floor ok
|
MIS12-00319
| MIS-Aging Inspection | 5/17/2016 | 5/17/2016 | 5/17/2016 8:52:50 AM | | FAIL |
|
|
check to see if garage has been converted Please call me when done. Thanks Darla Phone #: ###-####,, stop work order issued,, garage has been converted,, it is being occupied,, it appears that the only thing left is the siding.. owner mentioned setback issues for parking,, has has been e mailing M. Garner,, 2 year process?.. said she was told that it was a $700 fee to go to the commision on a variance?,, she is not working now,, etc. etc.
|