MEC16-02109
| Final | 5/16/2016 | 5/17/2016 | 5/17/2016 4:38:57 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by RaChelle Frisbee
|
MEC16-01755
| Rough-in | 5/17/2016 | 5/17/2016 | 5/17/2016 4:12:53 PM | P | PART |
|
|
Call for access Phone #: 2088718789 >> Inspection requested via mobile web by Albert - 1st layer fire wrap pass
|
MEC16-02091
| Pressure Test | 5/17/2016 | 5/17/2016 | 5/17/2016 3:44:55 PM | P | FAIL |
|
|
3ish please call Josh ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss - Remodel work being done with out permits. Builder needs to get proper permits before gas inspection can be done.
|
MEC16-02110
| Pressure Test | 5/16/2016 | 5/17/2016 | 5/17/2016 3:09:50 PM | P | PASS |
|
|
Call Eric to coordinate - 412.6613 - Thank you!! Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek - 5lb flue
|
MEC16-02110
| Final | 5/16/2016 | 5/17/2016 | 5/17/2016 3:08:51 PM | P | PASS |
|
|
Call Eric to coordinate - 412.6613 - Thank you!! Phone #: ###-#### Inspection requested via web by Dawn Kalsbeek
|
MEC16-01517
| Conference | 5/17/2016 | 5/17/2016 | 5/17/2016 2:35:46 PM | P | DONE |
|
|
Request 1pm conference with plumber, general contractor and HVAC contractor to discuss flue routing. Phone #: ###-#### Inspection requested via web by Brandon Sorensen - we discussed combustion air for the furnaces and water heater in the mechanical room. They are going to use existing louvered openings in to the mechanical room for the combustion air to the furnaces. the power vent water heater will be piped out with the flue
|
MEC16-00766
| Final | 5/17/2016 | 5/17/2016 | 5/17/2016 2:21:20 PM | P | FAIL |
|
|
Call access // Dale Phone #: ###-#### - need combustion air for furnace, need electrical service switch on furnace, need to seal up holes in coil box.
|
MEC16-01448
| Final | 5/17/2016 | 5/17/2016 | 5/17/2016 2:06:01 PM | P | PASS |
|
|
would like call ahead; Burnett Phone #: ###-####
|
MEC16-01572
| Final | 5/16/2016 | 5/17/2016 | 5/17/2016 1:45:45 PM | P | PASS |
|
|
Please go after 12 pm and call Kent at ###-#### before arriving, thank you. Phone #: ###-#### Inspection requested via web by TERESA HUTTO
|
MEC16-02112
| Final | 5/17/2016 | 5/17/2016 | 5/17/2016 1:42:41 PM | P | PASS |
|
|
If you can''t reach Dave at ###-####, call Dan at ###-####. Please give a 30 min heads up arrival time. Phone #: ###-#### Inspection requested via web by David or K Cole
|
MEC16-02105
| Final | 5/16/2016 | 5/17/2016 | 5/17/2016 1:15:13 PM | P | CANC |
|
|
Late PM inspection please installer: Jarod ###-#### Thank you Phone #: ###-#### Inspection requested via web by Dustin Rich - I talked to Jarod he said this job canceled
|
MEC16-01157
| Final | 5/17/2016 | 5/17/2016 | 5/17/2016 11:45:56 AM | P | PASS |
|
|
|
MEC16-01474
| Final | 5/16/2016 | 5/17/2016 | 5/17/2016 11:44:23 AM | A | FAIL |
|
|
Call for access Phone #: 2088718789 >> Inspection requested via mobile web by Albert - Need 1" clearance to b-vent for water heater, need additional supports under gas piping to make up air unit on roof, need to support gas pipe to wall for water heater inside the space
|
MEC16-02075
| Final | 5/16/2016 | 5/17/2016 | 5/17/2016 10:47:24 AM | A | PASS |
|
|
Please inspect in AM, but after 9 AM. Homeowner is Bernice Goodin, ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
MEC16-01943
| Final | 5/10/2016 | 5/17/2016 | 5/17/2016 10:35:58 AM | A | PASS |
|
|
Late AM inspection please Installer - Jarod ###-#### Thank you Phone #: ###-#### Inspection requested via web by Dustin Rich
|
MEC16-01949
| Rough-in | 5/16/2016 | 5/17/2016 | 5/17/2016 10:22:13 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan Otero
|
MEC16-02107
| Rough-in | 5/16/2016 | 5/17/2016 | 5/17/2016 10:11:34 AM | A | PASS |
|
|
Please call James at ###-#### for access information if no one is home. Thanks. Inspection requested via web by 4 Seasons
|
MEC16-01852
| Rough-in | 5/16/2016 | 5/17/2016 | 5/17/2016 9:54:48 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jamie Scibior
|
MEC16-01852
| Final | 5/17/2016 | 5/17/2016 | 5/17/2016 9:54:14 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jamie Scibior
|
MEC16-01618
| Rough-in | 5/17/2016 | 5/17/2016 | 5/17/2016 9:42:23 AM | A | PART |
|
|
Angle inspection 1st and second floor Inspection requested via web by william kerwin - 1st and 2nd fkoor angles okay
|
MEC16-01285
| Rough-in | 5/17/2016 | 5/17/2016 | 5/17/2016 9:41:24 AM | A | FAIL |
|
|
3rd floor rough. Units and corridor Inspection requested via web by william kerwin - There is no 3rd floor on this bldg. the wrong permit was called in. Need to schedule the right permit
|
MEC16-01088
| Rough-in | 5/16/2016 | 5/17/2016 | 5/17/2016 8:58:44 AM | A | PASS |
|
|
cover inspection for the Southwest bathroom and South-East T Bar Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
MEC16-01470
| Rough-in | 5/16/2016 | 5/17/2016 | 5/17/2016 8:33:58 AM | A | PART |
|
|
light test grease duct Phone #: ###-#### Inspection requested via web by Brandon Sorensen - light test pass
|
MEC16-01985
| Final | 5/10/2016 | 5/17/2016 | 5/11/2016 12:16:44 PM | P | CANC |
|
|
Installation being completed same day. Please call homeowner 30 mins prior to arrival/ Jeff ###-#### Phone #: ###-#### >> Inspection requested via web by Kassy Goodwin Inspection cancelled from web by: Kassy Goodwin
|