FIR17-00120
| INSP-Sprinkler Rough-in | 5/17/2017 | 5/17/2017 | 5/17/2017 4:00:34 PM | P | PART |
|
|
Partial rough to cover inspection complete for the underground supply, straight sections of pipe approved for cover, all thrust blocks at changes of direction will be poured and inspected at a later date.
|
FIR17-00001
| INSP-Sprinkler Rough-in/Hydro | 5/15/2017 | 5/17/2017 | 5/17/2017 3:58:38 PM | P | PART |
|
|
Hydrostatic test for levels 1 and 2 complete. Rough to cover inspection complete for level 1, partial rough to cover inspection complete for level 2, levels 1 and 2 approved for cover except for the area's on level 2 where tenting still needs to be installed over fire sprinkler piping in attic spaces.
|
FIR16-00606
| INSP-Sprinkler Rough-in | 5/17/2017 | 5/17/2017 | 5/17/2017 3:58:16 PM | P | PART |
|
|
Rough to cover inspection complete for overhead fire sprinkler piping located east of the elevator lobby on level 2, all of level 2 approved for cover.
|
FIR17-00199
| INSP-Final Inspection | 5/15/2017 | 5/17/2017 | 5/17/2017 2:27:57 PM | P | PASS |
|
|
Final fire sprinkler inspection passed/complete
|
FIR17-00199
| INSP-Sprinkler Rough-in | 5/15/2017 | 5/17/2017 | 5/17/2017 2:27:24 PM | P | PASS |
|
|
Rough in inspection for overhead fire sprinklers complete
|
FIR16-00755
| INSP-Sprinkler Rough-in/Hydro | 5/17/2017 | 5/17/2017 | 5/17/2017 12:01:44 PM | P | PART |
|
|
Overhead hydrostatic test complete, noted that the garages have fire sprinkler piping/heads installed, some piping is located in attic spaces, this piping is tented with plastic sheeting but no insulation installed over the top, a minimum of R38 insulation needs to installed over fire sprinkler piping, fire sprinkler piping located in attic spaces in garages cannot be covered until insulation install is verified. The garages will need to have active conditioning installed to keep the fire sprinkler pipe/heads from freezing.
|
FIR16-00774
| INSP-Sprinkler Rough-in/Hydro | 5/17/2017 | 5/17/2017 | 5/17/2017 11:59:44 AM | P | PASS |
|
|
Overhead fire sprinkler piping hydrostatic test complete.
|
FIR17-00207
| INSP-Final Inspection | 5/16/2017 | 5/17/2017 | 5/17/2017 11:20:14 AM | A | PART |
|
|
Final inspection for door release complete, no automatic closer installed on the door at time of inspection (magnet released door but door would not close), after closer is installed/inspected for operation then permit can be signed off as complete.
|
FIR16-00088
| INSP-Sprinkler Rough-in/Hydro | 5/17/2017 | 5/17/2017 | 5/17/2017 10:24:38 AM | P | PASS |
|
|
24 hour air test on both dry systems complete
|
FIR16-00299
| INSP-Sprinkler Rough-in | 5/16/2017 | 5/17/2017 | 5/17/2017 9:27:39 AM | A | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping/pendant heads in hotel resident rooms on level 10 complete, hotel resident rooms on level 10 approved for cover.
|
FIR16-00267
| INSP-Sprinkler Rough-in | 5/15/2017 | 5/17/2017 | 5/17/2017 9:26:05 AM | A | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping located above hardlids in the B side 3rd-6th floors complete (west wing) hardlids approved for cover.
|
FIR17-00001
| INSP-Sprinkler Rough-in/Hydro | 5/15/2017 | 5/17/2017 | 5/15/2017 4:27:38 PM | A | CANC |
|
|
Call Jake when heading out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
|