BLD18-03667
| BLD-Other | 5/16/2019 | 5/17/2019 | 5/20/2019 8:49:59 AM | A | PART |
|
|
fire wall // Joe Phone #: ###-#### sheet rock behind ledger ok
|
BLD19-00639
| BLD-Foundation | 5/16/2019 | 5/17/2019 | 5/20/2019 8:49:06 AM | P | PART |
|
|
Justin-Please call for access Phone #: ###-#### 3rd floor ramp ok after spec inspection
|
BLD18-03990
| BLD-Wall Bracing | 5/16/2019 | 5/17/2019 | 5/20/2019 8:48:14 AM | P | PEND |
|
|
wall cast in place, W side // Brian Phone #: ###-#### ok after spec inspection
|
BLD19-00052
| BLD-Final | 5/17/2019 | 5/17/2019 | 5/17/2019 3:52:56 PM | P | NR |
|
|
HVAC final is scheduled for am. Please call me prior to heading that way. I will meet you ang get you access to the property. Thanks. -Ryan Allen Phone #: ###-#### Inspection requested via web by Ryan Allen
|
BLD19-00281
| BLD-Final | 5/17/2019 | 5/17/2019 | 5/17/2019 3:52:29 PM | P | NR |
|
|
As late as possible Phone #: 2083188954 >> Inspection requested via mobile web by Jim Douglas
|
BLD18-02570
| BLD-Final | 5/16/2019 | 5/17/2019 | 5/17/2019 1:25:35 PM | P | PASS |
|
|
Call ahead // Jon Phone #: ###-####
|
BLD19-01702
| BLD-Footing | 5/16/2019 | 5/17/2019 | 5/17/2019 10:46:13 AM | A | PASS |
|
|
Call ahead // Gary Phone #: ###-####
|
BLD19-00769
| BLD-Other | 5/16/2019 | 5/17/2019 | 5/17/2019 10:22:07 AM | A | PASS |
|
|
stem wall // Ed Phone #: ###-####
|
BLD17-04219
| BLD-Wall Bracing | 5/16/2019 | 5/17/2019 | 5/17/2019 10:13:42 AM | A | PASS |
|
|
Inspection for Shear on exterior prior to installing Tyvek Phone #: ###-#### Inspection requested via web by Cameron Brown
|
BLD18-03814
| BLD-Conference | 5/16/2019 | 5/17/2019 | 5/17/2019 8:55:59 AM | A | PASS |
|
|
Keith Phone #: ###-####
|
BLD18-04493
| BLD-Final | 5/16/2019 | 5/17/2019 | 5/17/2019 8:33:28 AM | A | DONE |
|
|
Larren Phone #: ###-####
|
BLD19-00551
| BLD-Final | 5/16/2019 | 5/17/2019 | 5/17/2019 8:33:11 AM | A | DONE |
|
|
Larren Phone #: ###-####
|