Inspections for the day of: Thursday, May 18, 2000.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-00224 FIRE-Final Inspection5/17/20005/18/20005/18/2000 12:00:00 AMAPASS
###-####
BLD98-02646 FIRE-Final Inspection5/17/20005/18/20005/18/2000 12:00:00 AMAPASS
###-####
BLD99-01676 FIRE-Final Inspection5/17/20005/18/20005/18/2000 12:00:00 AMAPASS
###-####
BLD98-02235 FIRE-Final Inspection5/17/20005/18/20005/18/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 05/17/2000 at 08:59:39. Contact: ###-####. Tested detectors for fire dampers- okay; penetrations need repair; rated doors not completed. 5/18/00 3:17:49 PM
BLD00-00746 FIRE-Final Inspection5/17/20005/18/20005/18/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 05/17/2000 at 09:15:12. Contact: ###-####.
BLD99-03400 FIRE-Final Inspection5/15/20005/18/20005/18/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 05/15/2000 at 17:04:55. Contact: ###-####. Wrong inspection- not ready for final. 5/22/00 8:59:33 AM
BLD99-03400 FIRE-Supply Line Hydro5/15/20005/18/20005/18/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 05/15/2000 at 17:05:22. Contact: ###-####. Wrong inspection type. 5/22/00 8:59:50 AM
BLD98-03661 FIRE-Conference5/17/20005/18/20005/18/2000 12:00:00 AMPPART
jim ###-#### fire conf--around 1:00 Okay to occupy front lobby office area. 5/22/00 9:01:08 AM
BLD99-03541 FIRE-Sprinkler Rough-in5/18/20005/18/20005/18/2000 12:00:00 AMPPASS
bob ###-#### fire r/i Okay to cover. 5/22/00 9:01:18 AM
BLD00-00030 FIRE-Final Inspection5/18/20005/18/20005/18/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 05/18/2000 at 10:14:32. Contact: ###-####. Exposed combustible surface in central stair require sprinklering or covering with non-combustible surfaces. 5/22/00 9:00:55 AM