BLD01-00482
| BLD-Final | 5/17/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-00482
| BLD-Final | 5/17/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-02159
| BLD-Wall cover | 5/17/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 05/17/2001 at 12:11:42. Contact: ###-####. cable coridor assemblies in place at south end of coridor ok at marked locations only ok. 5/18/2001 11:39:38 AM
|
BLD01-01099
| BLD-Footing | 5/17/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | A | PART |
|
|
###-####
|
BLD01-01101
| BLD-Footing | 5/17/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | A | PART |
|
|
###-####
|
BLD98-02047
| BLD-Conference | 5/16/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | A | PASS |
|
|
conference to extend permit ###-#### called phone number not the corect number stopped at the site and could see that work is in progess with trim out and taping of gyp. 5/18/2001 9:41:46 AM
|
BLD01-00198
| BLD-Final | 5/17/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | FAIL |
|
|
###-#### need ele c/n and final/ need mech final insp no access per notes. 5/18/2001 3:17:06 PM
|
BLD00-01563
| BLD-Concrete | 5/18/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 05/18/2001 at 06:55:23. Contact: ###-####. placed with special insp. pending report. 5/18/2001 2:27:49 PM
|
BLD01-00910
| BLD-Framing/Rough-in | 5/18/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 05/18/2001 at 10:46:03. Contact: ###-####. need mech insp. 5/18/2001 2:52:29 PM
|
MEC01-01483
| Rough-in | 5/18/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 301 On 5/18/2001 2:29:28 PM ok for cover
|
MIS01-00082
| BLD-Final | 5/18/2001 | 5/18/2001 | 5/18/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 301 On 5/18/2001 2:30:46 PM
|